估计成本
- 名estimated cost
-
任命时的估计成本。
Estimated cost at time of commission .
-
请回复原型的细节,估计成本,最低订货要求,和制造时间。
Please reply with prototype details , estimated cost , minimum order requirement , and manufacturing time .
-
这座桥五年前开始建造,到现在为止投资的成本已是估计成本的两倍。
The bridge was begun five years ago and the estimated cost has already doubled .
-
在估计成本时,您可能会忽略测试步骤的动态及不可预测的本质。
While evaluating cost , you might overlook the dynamic and unpredictable nature of testing procedures .
-
这一变化导致此类家庭的估计成本提高了33%。
The change led to an increase in the cost estimate of 33 % for the category .
-
估计成本收回的可能性应收账款逾期越久,无法全额收回的可能性越大。
Estimating cost recoverability The longer an account is past due , the greater the likelihood that it will not be collected in full .
-
大众汽车发言人说,现在估计成本还为时过早。但一些分析师表示,此次召回的成本可能高达6.18亿美元。
A VW spokesman said it was too early to estimate costs , though some analysts said the recall could run as high as $ 618 million .
-
权重判决确定了交换内核配置的持续时间,其实现机理为:对于给定的匹配,所选择的权重要使得剩余业务矩阵的估计成本为最优。
Weight decision decides the holding time of the configuration selected and is achieved by choosing a value such that the remaining traffic matrix has the best cost estimate .
-
美国政府官员近日对IMF分析中使用的方法提出质疑,称该组织估计的成本看上去过高。
US officials yesterday challenged the methodology used in the analysis and said the cost estimate looked far too high .
-
这些信息包括响应时间、此事务的SQL语句计数、估计的成本、排序统计数据、与锁相关的详细信息等等。
This includes information such as response time , an SQL statement 's count of that transaction , cost estimation , sorting statistics , locking related details , and so on .
-
而且,solidDB查询优化器通过以一种新的方式估计执行成本,判别内存中的表的不同性质。
Further , the solidDB query optimizer recognizes the different nature of the in-memory tables by estimating execution costs in a new way .
-
例如,分析师估计,成本最高的加拿大重油生产商需要布伦特(brent)原油价格至少在每桶85美元,才能弥补其成本。
For example , analysts estimate that the highest cost Canadian heavy-oil producers need Brent crude to be trading at least at US $ 85 a barrel to cover their costs .
-
让大型食品企业更换部分氢化油,成本可能非常高昂(FDA自己估计,成本高达60亿美元),主要原因在于模仿部分氢化油的表现十分困难。
It may be really expensive for Big Food to replace partially hydrogenated oils the F.D.A. itself estimates the cost at $ 6 billion mainly because trying to mimic their performance is going to be tricky .
-
让大型食品企业更换部分氢化油,成本可能非常高昂(FDA自己估计,成本高达60亿美元),主要原因在于模仿部分氢化油的表现十分困难。可那是这些企业的问题。
It may be really expensive for Big Food to replace partially hydrogenated oils - the F.D.A. itself estimates the cost at $ 6 billion - mainly because trying to mimic their performance is going to be tricky .
-
分析师们估计,成本可能高达25亿美元。
Analysts estimated that the costs could be $ 2.5bn .
-
而2012年伦敦奥运会目前估计的成本是110亿英镑。
The current estimate for the cost of the Olympics in 2012 is 11bn .
-
已提供估计或成本。
An estimate or cost has been provided .
-
鉴于报告中估计的成本和好处,提早行动似乎是明智的。
Given the costs and benefits estimated in the report , early action seems sensible .
-
利用估计的成本无效率值分析了7个成本无效率因素。
Using the value of cost inefficiency , analyze seven attributions that effect cost can not be efficient .
-
周四,新华社估计建造成本可达106亿美元(3500亿泰铢)。
The Xinhua news agency on Thursday estimated the construction cost at US $ 10.6 billion ( 350 billion baht ) .
-
本篇论文是在已知的分布函数和估计的成本概率分布直方图之间期望值和标准差达到最小估计偏差为前提条件下,提出了一个切实可行和精确的选择方法。
This paper proposes a practical and accurate selection method based upon the least differences of expected values and standard deviations between a known distribution and an estimated cost probability histogram .
-
项目价值的计算基于开发成本、维护成本、估计替换成本和该项目带来的年度业务价值的分析。
Calculating an item 's value is based on analysis of the development costs , the maintenance costs , the estimated replacement costs , and the annual business value contributed by that item .
-
针对项目成本超支问题,考虑项目的实际运作,将管理弹性的价值添加到项目管理中,力求更好地估计项目成本,最终使项目成本得到控制。
The paper , focusing on the problem of cost overrun of a project , adds managerial flexibility value to project management to have project cost controlled finally with considering the actual performing of a project .
-
他们还估计工期和成本来完成工程项目。
They also estimate the time and cost to complete projects .
-
基于时间估计的作业成本法改进研究
Research on Improvement of Traditional ABC by Incorporating Time Estimation
-
采用三种方法来估计混合固定成本的功能。
Use three methods to estimate mixed-cost functions .
-
估计项目的成本、工作,和持续时间,以及其方差
Estimate the project 's cost , effort , and duration , along with its variance
-
利用随机决定分析的方法估计发电企业成本函数的包络,以1991年的数据为样本初步分析中国燃煤基荷电厂中的规模经济。
The DSA method is used to estimate the envelope of cost function in electricity generation enterprises .
-
官员们估计,重建成本将超过3000亿美元,这很可能会被证明低于最终的数字。
Official estimates put rebuilding costs at more than $ 300bn , which may well prove to be lower than the ultimate price .
-
但是,估计的总成本效益将$142879624美元,远超过工程兴建成本加上营运开支的费用。
However , the total benefit is estimated to be US $ US $ 142,879,624 that much surpasses the construction costs plus operation expenses .