调峰

  • 网络peaking;peak shaving;peak-shaving;cyclic operation
调峰调峰
  1. 利用输气管道模拟软件(TGNET)研究了2008年西气东输管道的短期调峰问题。

    Based on the West-to-East Gas Pipeline 's operation in2008 , the research on short-term peak shaving is carried out .

  2. 上游对本工程采用LNG调峰和局部气化供气的气源供应承诺。

    LNG supply commitment from upper end for the use of peak shaving and local supply in this project ;

  3. 同时,应适度发展LNG调峰设施。

    Meanwhile , the LNG peak - adjustment facilities need to be developed .

  4. LNG调峰站与天然气储气设施的联合调峰

    Peak-shaving Combined LNG Peak-shaving Station with NG Storage Facilities

  5. 湖北电网AGC机组调峰和调频问题的探讨

    Discussion on the Problem of Peak Load and Frequency Regulation with AGC Generators in Hubei Power System

  6. 对于城市月高峰用气,应大力采用LNG调峰设施、洞穴调峰设施等快采快注且外输量相对较大的方式;

    Options such as LNG and cave peak adjustment facilities shall be adopted for the monthly peak adjustment in urban areas .

  7. 随着天然气在城市中的广泛应用以及LNG技术的发展,天然气调峰问题日益突出。

    With the natural gas using in city and the development of LNG , the situation gas peak shaving becomes more and more serious .

  8. 300MW机组调峰运行的研究与分析

    Research and Analysis on Peak Clipping Operation of 300 MW Generating Sets

  9. 国产引进型300MW机组对两班制调峰的适应性分析

    Analysis of 300 MW Units Adaptability to Two-shift Operation

  10. 中国在LNG工业的发展相对较晚,近十多年以来,先后建成了上海LNG事故调峰站,新疆广汇天然气液化工厂。

    In china , LNG industry development is relatively later , nevertheless , Shanghai LNG peak-shaving station , Xinjiang Guanghui NGL have been built in the last decades .

  11. 从设备情况和运行实践两方面,证明了引进型300MW机组基本具备两班制调峰的能力。

    The ability of both equipment structure and operation practice of this type unit is shown .

  12. 文章提出了调峰机组以最佳的变负荷速率来响应电网自动发电控制(AGC)指令的新思路。

    In this paper , a new concept that steam turbine generator unit quickly responds to the director of Automatic generation control ( AGC ) by optimal Changing Load-acceleration is presented .

  13. 杨柳青电厂国产100MW机组两班制调峰运行的试验研究

    Two-Shift Cycling on Yang Liu Qing 's 100 MW Unit

  14. 9E燃气轮机调峰运行方式对转子寿命和维修周期的影响

    Influence of Peaking Operation Mode on Rotor Life and Maintenance Cycle of 9E Gas Turbine

  15. 前置掺气坎式阶梯溢洪道掺气水深及消能率的计算CNG混空气掺混弛放气作为调峰气源的应用

    Calculation of aerated water depth and energy dissipation rate of a pre-aerator stepped spillway The application of CNG-air mixture adding purge gas used as gas source for peak load adjustment

  16. 国产200MW供热机组供热调峰能力的试验研究

    Testing of Regulating Capacity of Heat Supply for 200 MW Heating Unit

  17. 吉林热电厂200MW汽轮机组调峰经济性试验

    Economy Test for Peaking by 200 MW Sets of Jilin Cogeneration Plant

  18. 给水加氧处理法在200MW调峰机组上的应用研究

    Application of combined water treatment in 200 MW cycling unit

  19. 国产200MW调峰机组启动曲线的优化

    Optimization of Starting Curve of Indigenous 200 MW Peaking Unit

  20. 国产200MW超高压燃煤火电机组调峰试验研究

    Peaking Test and Research on 200 MW Domestic Superhigh Pressure Coal fired Units

  21. 200MW锅炉改善调峰性能的措施

    Measures to Improve Regulating Performance of 200 MW Boiler

  22. VSC-HVDC系统用于实现互联电网的调峰和紧急功率支援时,其潮流需要随时翻转。

    As VSC-HVDC system for the realization of power grid peak load mutual regulation and the emergency power support , the load flow flips at any moment .

  23. 220MW机组调峰运行方式试验研究

    Experimental Study On 220 MW Unit Regulating Operating Mode

  24. 200MW机组电站锅炉调峰低负荷水循环安全可靠性

    The Reliability on Water Circulation Safety of Peak Shaving Low Load in 200 MW Power Plant Boiler

  25. 700MW级多轴燃气-蒸汽联合循环机组调峰和启动特性

    Start-up and peaking characteristics of a 700 MW-class combined gas-steam cycle unit with multi-shaft arrangement

  26. 分析了2008年上海城市天然气用户高峰周的负荷曲线,采用高压管道、高压球罐以及LNG调峰站共同承担调峰任务,确保正常安全供气。

    The load curve of the peak week for Shanghai urban natural gas users in 2008 is analyzed . High-pressure pipeline , high-pressure spherical gasholder and LNG peak-shaving station will be used together for peak-shaving to assure normal safe gas supply .

  27. 200MW机组热态启动问题分析与两班制调峰运行方式的探讨

    Analysis on the Hot Start of 200 MW Units and Discussion on Their Operating Mode of Two-shift Peak Load Covering

  28. 论述了在200MW机组电站锅炉所作的调峰低负荷水循环安全在线监测试验。

    This paper has been described on line monitoring test of water circulation safety on 200 MW power plant boiler .

  29. 介绍了将给水加氧处理法(CWT)用于200MW直流炉调峰机组的给水处理中所取得的经验和成果。

    The experience and achievement of applying combined water treatment ( CWT ) in the feedwater treatment of 200 MW cycling unit with once-through boiler were introduced .

  30. 以一台300MW机组为例的分析表明,参与调峰运行的机组通过改进氧量控制,能有效降低运行可控损失,提高运行经济性。

    The analysis of a 300 MW power generator shows that the controllable operation loss is reduced by the oxygen content optimization , and the economic operation is achieved .