厂区总平面布置
厂区总平面布置
-
由于需要保留个别机组,厂区总平面布置比较紧张,根据计算,选择的2座5000m2逆流式自然塔不能按规范规定的距离进行布置。
With some units to be reserved and inadequate general layout space , the selected two 5 000 m2 reverse-flow natural draft cooling towers can not be arranged in the specified distance .
-
厂区环境意识与总平面布置
Environmental consideration and general layout plan of factory site