厂区总平面布置

厂区总平面布置厂区总平面布置
  1. 由于需要保留个别机组,厂区总平面布置比较紧张,根据计算,选择的2座5000m2逆流式自然塔不能按规范规定的距离进行布置。

    With some units to be reserved and inadequate general layout space , the selected two 5 000 m2 reverse-flow natural draft cooling towers can not be arranged in the specified distance .

  2. 厂区环境意识与总平面布置

    Environmental consideration and general layout plan of factory site