项目环评

项目环评项目环评
  1. 目前,SEA的多数理论是在项目环评的基础上发展而来的,不足以解决预测中的不确定性问题。

    Most of the SEA theories derive from project environmental assessment and are sufficient to cope with uncertainty .

  2. 大型城市污水处理厂项目环评有关问题的探讨

    Discussion on Environmental Impact Assessment of Large-scale Municipal Wastewater Treatment Plants

  3. 城市轨道交通规划环评特点及其与项目环评之区别

    Characteristics of Urban Rail Transit Planning EIA and Difference with Project EIA

  4. 项目环评阶段推行清洁生产的研究与实践

    Research and Practice of Improving Cleaning Production during the Process of EIA

  5. 小型建设项目环评报告质量与对策研究

    Quality Assurance of Environment Impact Assessment Statement for Small Scale Construction Projects

  6. 论建设项目环评的公众参与

    Discussion on Public Participation in Environment Assessment of Construction Project

  7. 建设项目环评中的清洁生产分析与评价

    Analysis and Assessment of Clean Production in Environmental Assessment of Construction Project Ifems

  8. 试论建设项目环评中总量控制目标的确定及验证

    Discussion on definition and verification of gross emission controlling objective in construction project

  9. 探讨水泥行业建设项目环评需注意的几个问题

    Study on Issues in Cement Industry Environment Impact Assessment

  10. 居住环境适宜性在房地产项目环评中的应用

    Application of Residential Environmental Adaptability to Environmental Influence Assessment of Real Estate Project

  11. 屠宰项目环评中废水治理技术的应用与评价

    Application and evaluation of treatment techniques of slaughter wastewater in environmental impact assessment

  12. 邻硝基对氯苯胺项目环评恶臭污染防治分析

    Analysis on Effluvium Pollution Prevention and Treatment for Environment Assessment for 2-NO_2,4-Cl Aniline Project

  13. 铁合金建设项目环评应关注的几个问题

    Problems to be Focused on Ferroalloy Construction Project

  14. 建设项目环评循环经济指标体系研究

    Recycle Economy Indicator System in Environmental Impact Assessment

  15. 规划环评与项目环评的区别、规划环评面临的困难及对策

    The difference between planning EIA and project EIA and difficulty of planning EIA and Its Countermeasures

  16. 阐述了环评档案建档、归档工作,提高建设项目环评档案整体水平应抓好的几项工作。

    The paper explains environmental assessment files'building pigeonholes and the works to improve the projects files'integral level .

  17. 浅析如何做好矿山选矿项目环评中地质现状调查工作

    The preliminary analysis of current situation geological survey work of environmental impact assessment of mineral dressing project

  18. 探索在项目环评阶段推行清洁生产。并通过实践过的案例,阐述了项目环评阶段推行清洁生产的可操作性。

    By case analysis , the maneuverability of improving cleaning production during the process of EIA is expatiated .

  19. 然后,按照听证的时间顺序,分别论述了建设项目环评报告书审批听证前的准备机制、听证中的进行机制与听证后的回应机制。

    Then , paper discussed the ready mechanism before hearing , the mechanism in hearing and the response mechanism of the hearing system in approval of construction project EIA reports .

  20. 西部地区地质勘查工作程度较低,通过进一步调查评价和勘查,发现新矿产地的潜力巨大。浅析如何做好矿山选矿项目环评中地质现状调查工作

    Geological exploration of Western China is still inadequate , but further investigation and survey have proved huge potentials for discovering new mines . THE PRELIMINARY ANALYSIS OF CURRENT SITUATION GEOLOGICAL SURVEY WORK OF ENVIRONMENTAL IMPACT ASSESSMENT OF MINERAL DRESSING PROJECT

  21. 近日,相关专家来衡对水口山金铜项目进行环评。

    Recently , the relevant experts to value of gold and copper project Shuikoushan EIA .

  22. 他在一份讲话中表示:有些学者、市民对该项目的环评情况不够了解。

    Some scholars and residents have an inadequate understanding of the environmental impact process , he said in the statement .

  23. 根据实际工作经验,总结了在石油化工建设项目的环评工作中应注意的一些问题。

    According to the experience of author , this article raises some key points for Environmental Impact Assessment of Petrochemical Project .

  24. 作者根据多年来的环评工作经历,就房地产开发项目的环评从法律依据及项目分类管理、选址分析、标准选取、评价要点等方面进行较全面的分析阐述。

    According to the authors ' many-year experience of EIA in real estate development projects , this paper demonstrates environmental impact assessment from the perspectives of the basis of law and project management , location analysis , selection criteria , the main evaluation points .

  25. 3个内蒙古项目也通过环评。

    Three other such projects were also approved in Inner Mongolia .

  26. 工程项目须按照环评报告所载的资料及建议来建造。

    The Projects shall be constructed in accordance with the information and recommendations contained in the EIA Report .

  27. 须依据工程项目简介及环评报告内载资料及建议来解除指定工程项目的运作。

    The designated project shall be decommissioned in accordance with the information and recommendations contained in the project profile and the EIA report .

  28. 但是“自然肯尼亚”的PaulMatiku等环保人士说,缺少(肯尼亚环境法要求的)项目设计文件是环评过程的一个关键的疏忽。

    But conservationists such as Paul Matiku of Nature Kenya say the lack of project design documents required by Kenyan environmental law has been a critical omission in the assessment process .

  29. 任何人在违反本许可证的条件下建造、营办或解除工程项目,并且根据环评条例定罪,即可遭受。

    Any person who constructs , operates or decommissions the Project contrary to the conditions in the Permit , and is convicted of an offence under the Ordinance , is liable .

  30. 2005年初,中国国家环保总局对30个环保违规项目紧急叫停掀起环评风暴。

    In early 2005 . China State Environmental Protection Administration raised the ' environmental evaluation storm ' by urgently stopping 30 projects which violated environmental regulations and announced the start of a long march to establish a harmonious society .