虎跳峡站

虎跳峡站虎跳峡站
  1. 虎跳峡水电站可能最大洪水(PMF)地区组成研究

    A Study on Local Probable Maximum Flood Combination at the Hutiao Gorge Water-Power Station

  2. 接着,本文论述了采用当地暴雨放大方法和组合暴雨放大方法推求虎跳峡水电站可能最大暴雨(PMP)。

    Then , the computations of PMP for Hutiao Gorge Water-Power Station in computational means of Local Pattern and Combination Pattern are elaborated in this paper .

  3. 虎跳峡水电站大坝工程属一级大型土石坝。

    The major dam of Hutiao Gorge Water-Power Station is first chop large scale earth and rockfill dam .

  4. 金沙江虎跳峡水电站右坝肩复杂变形岩体工程效应研究

    On Engneering Reaction of Complexible Deformation Rock Mass on Right Dam Abutment of Tiger Leaping Gorge Hydroelectric Power Station

  5. 论文的研究成果直接为虎跳峡水电站的初步设计提供依据。

    The research findings of this paper will provide guidance for the preliminary design of Hutiao Gorge Water-Power Station .

  6. 虎跳峡水电站是金沙江中下游梯级的龙头电站,该电站的开发建设对金沙江水电梯级开发和“西电东送”的实施具有重要的战略意义;

    The Hutiaoxia Hydroelectric Project is a backbone power station of the cascade hydroelectric stations on the middle and lower reaches of the Jinsha River .

  7. 对虎跳峡水电站奔子栏至虎跳峡坝址区间流域可能最大暴雨计算,采用了当地暴雨放大和组合暴雨放大两种方法。

    In this paper , two methods were applied to calculate the PMP of the basin between Benzilan and the Hutiao Gorge Dam of the Hutiao Gorge hydro-power station : the combined storm maximization and the local storm maximization .

  8. 虎跳峡龙蟠右岸边坡的稳定性问题对拟建的虎跳峡水电站具有重要的意义。

    The stability of the right bank slope of Longpan in Tiger-Leaping Gorge area is important to the building of the Tiger-Leaping Gorge reservoir .