空气预热器

kōnɡ qì yù rè qì
  • air preheater;air heater
空气预热器空气预热器
  1. VN型回转式空气预热器转子径向隔板热弹性变形模型

    Thermoelastic model for deformation of the radial plate in rotary regenerative air heater

  2. 并介绍了螺旋槽管在一台100MW机组锅炉的低温级空气预热器应用情况,以及工业性试验结果。

    Its application in the low temperature air heater of100MW unit boiler and the result of industrial experiment are introduced .

  3. 高温空气预热器CAD系统的研究与开发

    The Research and Development of High Temperature Air Preheat Exchangers CAD System

  4. CE型空气预热器漏风的治理

    Treatment on the air leakage of the CE type air preheater

  5. PTFE塑料空气预热器的传热分析

    The Analysis of Heat Transfer for Pre-heating Air PTFE Plastic Heat exchanger

  6. 300MW回转式空气预热器技术改造探讨

    Study on the Technical Reform of 300 MW Rotating Air Preheater

  7. 脉冲吹灰装置在300MW机组空气预热器中的应用

    Application of Pulsating Soot-blower on the Air Preheater of 300 MW Unit

  8. 300MW锅炉容克式空气预热器的密封改造

    Renovation on Sealing of Air Preheater for 300 MW Boilers

  9. 300MW锅炉空气预热器烧损处理

    Treatment of damaged air preheater of 300 MW boiler after fuel secondary combustion

  10. 600MW机组回转式空气预热器的技术改造及效益分析

    Retrofit and its Effectiveness of the Rotary Air-Preheater of a 600 MW Set

  11. 600MW机组空气预热器改造

    Retrofit of Rotary Air Preheater for 600 MW Unit

  12. 300MW机组锅炉回转式空气预热器漏风原因及改造措施

    Air Leakage Cause and Reconstructing Measures of Rotary Air Preheater of 300 MW Boiler

  13. 600MW锅炉空气预热器漏风控制系统的调试

    Start-up Test of Air Leakage Control System of Air Preheater in 600 MW Boiler

  14. 采用工控机与可编程逻辑控制器(PLC)组成控制系统,增加过电流调节和保护等策略和功能,提高了系统可控性,减小了空气预热器漏风率。

    By applying control system composed of process-control-machine and programmable logic controller , adding tactics and functions of over-current regulation and protection , the controllability of the automatic system was heightened and the leakage rate of air preheater was reduced .

  15. 该装置采用污染式空气预热器和60°CW磁流体发电机,燃烧室的热输入为12&15兆瓦,全部灰渣通过发电机。

    An vitiation preheater and 60 ° DCW MHD generator are used at ECF . The thermal input of the combustor is 12-15 MW . Full slag passes through the MHD channel .

  16. 国产首台600MW锅炉二次汽温和空气预热器入口烟温偏低的原因分析和采取的对策

    Causes for Lower Secondary Steam Temperature and Air Preheater Inlet Smoke Temperature of First Chinese-made 600 MW Boiler

  17. 同时分析了转子单位时间热容Xr对三分仓空气预热器传热的影响。

    It is also analyzed how the calorific receptivity of the rotor influences on the heat transfer of the air preheater .

  18. 国产首台600MW锅炉机组回转式空气预热器吹灰器及相关问题的探讨

    Approach to Ash Blower of Slewing Air Preheater of First 600 MW Sets made in China and Its Relative Problems

  19. 计算表明,除空气预热器外,在(200~300)MW负荷范围内,辐射能信号与锅炉不同阶段的吸热量均呈线性变化。

    The calculation shows that the radiant energy signal and the absorbed heat in different stages of process in the boiler all to be linear variation in the range of load 200 ~ 300 MW , not including the air preheater .

  20. 介绍了可编程控制器C200H在热管空气预热器新型蒸汽巡扫吹灰系统中的应用情况。

    Application of PLC C200H on new steam soot-blower in heat pipe pre-heater is introduced .

  21. 根据发电机组计算机数据采集系统(DAS)烟气侧实时检测的烟气侧压差等参数,实现了300MW燃煤电站锅炉回转式空气预热器积灰状态的在线监测。

    On line ash monitoring of the rotary air heaters for a300MW coal fired utility boiler has been realized by processing the relevant operational data acquired from the DAS .

  22. VN技术在容克式空气预热器密封改造中的应用

    The Use of VN ( Vertical Layout of Air Heater and Nonadjustable Seal Partition Plate ) Technology in the Technical Modification of Seals for Ljungstrom Regenerative Air Heaters

  23. 分析采用SCR烟气脱硝装置后对锅炉岛的总体布置、锅炉钢结构、炉膛承压设计、空气预热器性能和设计及对引风机风压等的影响;

    The author gave a brief introduction of flue gas de-NOx technologies at home and abroad , analyzed the influence on boiler island arrangement , boiler steel structure , furnace pressure design , performance and design of air preheater , induced fan pressure header after installing SCR system .

  24. 在我国,大部分锅炉其省煤器、空气预热器与锅炉三者是安装成一个整体的,因此难以与国外NH3-SCR工艺直接匹配。

    The economizer , air preheater and boiler are installed into a entirety in our country , so the widely used NH3-SCR method is inapplicable in our country .

  25. 通过对淮北第二发电厂2台300MW燃煤机组锅炉回转式空气预热器(空预器)漏风原因的分析,提出了空预器双密封改造的可行性方案。

    Through cause analysis of air leakage in rotary air preheaters for boilers of two 300 MW coal-firing units at Huaibei Power Plant No. 2 , a feasible scheme of retrofitting the said air preheaters into dual-sealing has been put forward .

  26. 分析600MW等级大容量燃煤电站锅炉回转式空气预热器漏风产生的原因和控制措施,并对当前工程实际中空气预热器的性能评价方法和指标进行了论证,提出了较为科学的观点。

    Causes and control measures of rotary air preheater air leakage of 600 MW coal-fired power plant boiler are analyzed , after that , according to the demonstration of performance evaluation methods and the target of air preheater in the construction , scientific opinions are raised .

  27. 河北西柏坡发电厂300MW火电机组锅炉回转式空气预热器存在漏风和堵灰缺陷。其原因是转子的热变形、密封片两侧压差较大、风压较高造成转子两端漏风。

    The air leakage and ash blocking occurred to the rotary air preheaters of 300 MW boilers in Hebei Xibaipo Power Plant , whose causes are due to hot deformation of the rotors , great pressure difference at both sides of the seal packings and high air pressure .

  28. 大型回转式空气预热器漏风分析和改造措施

    Air Leakage Analysis and Modification of Large Scale Rotary Air Preheater

  29. 玻璃管空气预热器空气侧局部阻力特性的试验研究

    Local Resistance on the Air Side of Glass Tube Air Preheater

  30. 冷风道及空气预热器振动测试分析与治理

    The vibration measurement and control of the air chute and preheater