施工工期

  • 网络Construction period;Duration of Construction
施工工期施工工期
  1. 设置Morris加劲肋的端板连接节点性能比带有横向、斜向加劲肋且柱翼缘带有背板的节点性能稍低,可以用于承受荷载较小,要求施工工期短的中小工程。

    Connection performance by setting Morris Stiffener is a little lower than the connection with horizontal , diagonal stiffeners and the column flange strengthened by backing-plates . It can be used to medium-sized projects which bears smaller load and requirements of shorter construction period .

  2. 滩坑水电站第一个汛期施工工期紧、难度大,风险大。

    The Tankeng Hydropower Station is short in construction period and big difficult in its first flood season with big risk .

  3. 在探讨了BP神经网络的发展和应用性问题后,将LMBP算法作为本文BP网络的算法,并在此基础上建立了建筑施工工期&安全评价模型。

    Thesis discusses the development and application problems of BP neural network and put LMBP algorithm as this BP network algorithm to establish a construction schedule - safety evaluation model based on it .

  4. 温度应力和温度控制是混凝土大坝建设中的瓶颈问题,水工大体积混凝土外掺MgO不仅仅可以简化温控措施、加快施工工期,而且提高混凝土抗裂性能。

    Temperature stress and temperature control are the bottlenecks during construction of concrete dam . Mixing of MgO into hydraulic mass concrete can not only simplify the temperature control measures and accelerate the construction period , but improve the concrete cracking resistance .

  5. 根据美国UNOCAL企业标准的要求,此种管材的焊接应采用焊前预热+焊接+焊后热处理方法。因施工工期紧,焊后热处理时间不够,经试验,可免去焊后热处理工序。

    Because the time limit for the project is packed , and the time for heat treatment after welding is insufficient , the section of heat treatment after welding is exempt based on the experiment .

  6. 复杂山区铁路设计阶段施工工期确定

    Determine the construction period for complex mountain railway in design phase

  7. 确定施工工期的方法与遗传算法研究

    An Approach of Methods in Determining Time Limit for a Project

  8. 建筑工程项目施工工期与资源配置研究

    Study on the Construction Time and Resources Allocation of Construction Project

  9. 学习曲线在建筑施工工期预测中的应用研究

    Research on the Learning Curve 's Application in the Prediction of Work Period

  10. 次关键路线法在施工工期优化管理中的应用研究

    Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management

  11. 同时由于省略了刚节点部混凝土的二次浇注,缩短了施工工期。

    Moreover , it saves second-time concrete placing , and reduces the construction period .

  12. 浅述工程造价与施工工期的关系

    On Relation of Construction Cost and Period

  13. 通过对掘进机施工工期和成本的预测,评估掘进机的效能。

    Productivity of the tunnel boring machine is evaluated by predicting the time and cost .

  14. 建设项目施工工期优化的经济效益及其分配

    Economic Benefit and Its Distribution of

  15. 掺加高效减水剂可缩短施工工期,提高劳动效率。

    Addition of high range water reducing agent can shorten construction period and enhance labour efficiency .

  16. 影响隧道施工工期的风险分析

    Risk Analysis of Tunnelling Work Period

  17. 通过采用特殊的技术措施,节约了工程成本,缩短了施工工期。

    Using some special technical measures , they saved construction costs and shortened the construction time .

  18. 洪水风险事件识别采用层次分析法进行,并结合施工工期和防洪标准来确定洪水发生的概率。

    The method of Analytic Hierarchy Process is used to identify the risk events of flood .

  19. 第五章,对项目施工工期和费用之间的相关性进行深入研究;

    Chapter 5 , study the correlation deeply between project duration and cost ( time-cost trade-off ) .

  20. 施工工期短。

    Short construction stage .

  21. 征地拆迁工作是影响工程建设施工工期的重要因素,对工程建设的顺利进行有巨大的影响。

    The land levying and old house removal work is an important work that affects construction time limit .

  22. 其次介绍了施工工期、成本及质量三者之间的关系。

    Secondly we have made simple introduction to the dialectical relationship of the construction time , investment and quality .

  23. 该方案充分利用了有限的作业场地,节省了施工工期,创造了良好的社会效益和经济效益。

    This scheme applies finite field sufficiently , saves construction period , and creates good social and economic benefits .

  24. 以挣值管理方法为研究内容,分析工程造价与施工工期集成计划的内涵。

    The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method .

  25. 建议在路面标高受到限制、通车影响、施工工期等因素受到制约时。应优先考虑采用钢纤维混凝土路面。

    SFRC pavement should be considered to use in restriction of pavement standard , passing traffic and pavement period .

  26. 结构受力合理,提高材料的利用率,缩短施工工期,外形美观。

    It has reasonable mechanic property , improves material utilization , shortens construction period , and beatifies the shape .

  27. 彭水水电站规模较大,项目较多,施工工期紧。

    The construction of Pengshui hydropower station is characterized by its large scale , many construction items and urgent construction period .

  28. 本隧道从2001年8月20日开工,至2003年11月20日竣工,施工工期27个月。

    This project commenced on 20 August 2001 and completed on 20 November 2003 , with a total construction period of 27 months .

  29. 在此基础上概括了国内施工工期方面存在的问题和目前的状况。

    On the basis , Problems Existing in the construction time in our country are summarized , and the solving method is provided .

  30. 做好前期工作确保施工工期&浅议如何做好征地拆迁工作

    Do better preceding work ensuring construction time limit & simple talking about how to do better land levying and old house removal work