施工工期
- 网络Construction period;Duration of Construction
-
设置Morris加劲肋的端板连接节点性能比带有横向、斜向加劲肋且柱翼缘带有背板的节点性能稍低,可以用于承受荷载较小,要求施工工期短的中小工程。
Connection performance by setting Morris Stiffener is a little lower than the connection with horizontal , diagonal stiffeners and the column flange strengthened by backing-plates . It can be used to medium-sized projects which bears smaller load and requirements of shorter construction period .
-
滩坑水电站第一个汛期施工工期紧、难度大,风险大。
The Tankeng Hydropower Station is short in construction period and big difficult in its first flood season with big risk .
-
在探讨了BP神经网络的发展和应用性问题后,将LMBP算法作为本文BP网络的算法,并在此基础上建立了建筑施工工期&安全评价模型。
Thesis discusses the development and application problems of BP neural network and put LMBP algorithm as this BP network algorithm to establish a construction schedule - safety evaluation model based on it .
-
温度应力和温度控制是混凝土大坝建设中的瓶颈问题,水工大体积混凝土外掺MgO不仅仅可以简化温控措施、加快施工工期,而且提高混凝土抗裂性能。
Temperature stress and temperature control are the bottlenecks during construction of concrete dam . Mixing of MgO into hydraulic mass concrete can not only simplify the temperature control measures and accelerate the construction period , but improve the concrete cracking resistance .
-
根据美国UNOCAL企业标准的要求,此种管材的焊接应采用焊前预热+焊接+焊后热处理方法。因施工工期紧,焊后热处理时间不够,经试验,可免去焊后热处理工序。
Because the time limit for the project is packed , and the time for heat treatment after welding is insufficient , the section of heat treatment after welding is exempt based on the experiment .
-
复杂山区铁路设计阶段施工工期确定
Determine the construction period for complex mountain railway in design phase
-
确定施工工期的方法与遗传算法研究
An Approach of Methods in Determining Time Limit for a Project
-
建筑工程项目施工工期与资源配置研究
Study on the Construction Time and Resources Allocation of Construction Project
-
学习曲线在建筑施工工期预测中的应用研究
Research on the Learning Curve 's Application in the Prediction of Work Period
-
次关键路线法在施工工期优化管理中的应用研究
Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management
-
同时由于省略了刚节点部混凝土的二次浇注,缩短了施工工期。
Moreover , it saves second-time concrete placing , and reduces the construction period .
-
浅述工程造价与施工工期的关系
On Relation of Construction Cost and Period
-
通过对掘进机施工工期和成本的预测,评估掘进机的效能。
Productivity of the tunnel boring machine is evaluated by predicting the time and cost .
-
建设项目施工工期优化的经济效益及其分配
Economic Benefit and Its Distribution of
-
掺加高效减水剂可缩短施工工期,提高劳动效率。
Addition of high range water reducing agent can shorten construction period and enhance labour efficiency .
-
影响隧道施工工期的风险分析
Risk Analysis of Tunnelling Work Period
-
通过采用特殊的技术措施,节约了工程成本,缩短了施工工期。
Using some special technical measures , they saved construction costs and shortened the construction time .
-
洪水风险事件识别采用层次分析法进行,并结合施工工期和防洪标准来确定洪水发生的概率。
The method of Analytic Hierarchy Process is used to identify the risk events of flood .
-
第五章,对项目施工工期和费用之间的相关性进行深入研究;
Chapter 5 , study the correlation deeply between project duration and cost ( time-cost trade-off ) .
-
施工工期短。
Short construction stage .
-
征地拆迁工作是影响工程建设施工工期的重要因素,对工程建设的顺利进行有巨大的影响。
The land levying and old house removal work is an important work that affects construction time limit .
-
其次介绍了施工工期、成本及质量三者之间的关系。
Secondly we have made simple introduction to the dialectical relationship of the construction time , investment and quality .
-
该方案充分利用了有限的作业场地,节省了施工工期,创造了良好的社会效益和经济效益。
This scheme applies finite field sufficiently , saves construction period , and creates good social and economic benefits .
-
以挣值管理方法为研究内容,分析工程造价与施工工期集成计划的内涵。
The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method .
-
建议在路面标高受到限制、通车影响、施工工期等因素受到制约时。应优先考虑采用钢纤维混凝土路面。
SFRC pavement should be considered to use in restriction of pavement standard , passing traffic and pavement period .
-
结构受力合理,提高材料的利用率,缩短施工工期,外形美观。
It has reasonable mechanic property , improves material utilization , shortens construction period , and beatifies the shape .
-
彭水水电站规模较大,项目较多,施工工期紧。
The construction of Pengshui hydropower station is characterized by its large scale , many construction items and urgent construction period .
-
本隧道从2001年8月20日开工,至2003年11月20日竣工,施工工期27个月。
This project commenced on 20 August 2001 and completed on 20 November 2003 , with a total construction period of 27 months .
-
在此基础上概括了国内施工工期方面存在的问题和目前的状况。
On the basis , Problems Existing in the construction time in our country are summarized , and the solving method is provided .
-
做好前期工作确保施工工期&浅议如何做好征地拆迁工作
Do better preceding work ensuring construction time limit & simple talking about how to do better land levying and old house removal work