工期优化

  • 网络time optimization;project duration optimization
工期优化工期优化
  1. 搭接施工网络工期优化研究

    A Study on Time Optimization of Alternate Construction Network

  2. 网络计划优化主要包括:工期优化、费用优化、资源优化三个方面。

    Network planning optimization mainly includes three aspects : time optimization 、 cost optimization 、 resource optimization .

  3. DP法工期优化

    Optimization of duration by DP

  4. TFE法&网络计划工期优化的新思路

    TFE method & the New Train of Thought of Network Plan Time Limit for a Project Optimization

  5. 工期优化数学模型研究

    Research of Optimization Mathematical Model of Time Limit for a Project

  6. 建筑工程施工网络计划工期优化方案的确定

    Period Optimization Scheme Determination of Building Engineering Construction Network Plan

  7. 基于优先系数的最短工期优化方法

    On Optimum Method of the Shortest Project Time Limit Based on Priority Coefficient

  8. 网络计划资源工期优化

    Optimization of the resource and duration in activity networks

  9. 建设工程项目工期优化分析

    The Time Limit Optimization Analysis of Constructive Engineering Project

  10. 次关键路线法在施工工期优化管理中的应用研究

    Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management

  11. 美国人的时间观关于工期优化的研究

    Study on the Optimization of Construction Time

  12. 工程网络计划的工期优化

    Construction period optimization of project network schedule

  13. 建设项目施工工期优化的经济效益及其分配

    Economic Benefit and Its Distribution of

  14. 再对盛景园项目工期优化、费用优化、资源优化的方法上进行分析,得到项目优化的着力点。

    Optimized project duration , cost optimization , resource optimization analysis , are necessary for project optimization .

  15. 指出工期优化主要有技术和组织等措施;

    Time limit for a project being optional mainly refers to the measures of technique and organization .

  16. 动态规划法在网络成本工期优化中的应用

    The application of the method of dynamic planning in rectifying networks cost of the time limit for a project

  17. 施工网络优化包括工期优化、资源有限优化、资源均衡优化、工期成本优化,施工网络优化可以有效缩短工期,减少费用,均衡资源分布,因此施工网络优化非常重要。

    Construction network optimization includes construction period optimization , resource limited optimization , resource equipoise optimization , cost optimization .

  18. 因此,本文通过建立工期优化模型和应用关键链方法对可能出现延期情况下的后续工序进行优化。

    Therefore , this duration by establishing the model and application of the key link methods to be postponed , the follow-up process .

  19. 根据其优化目标,网络计划的优化可分为:工期优化、资源优化和费用优化三类。

    The optimization of network planning can be divided into time limit optimization , resource optimization and expense optimization in term of its objective .

  20. 提出通过计算各工序优先系数的方法进行资源限定,实现最短工期优化,使该类型的优化从定性优化变成了定量优化,为该类型的优化提供了一个新的求解思路。

    This paper puts forward an optimum method by computing the priority coefficient of each working procedure to limit resources and implement the optimization of the shortest time limit for a project .

  21. 通过瓶颈资源的识别,确定出现延期的工序,然后将关键链引入到施工项目工期优化中,建立了关键链优化模型。

    Through bottlenecks of resources , establish a process , and then put the key link will be introduced into the construction project , the duration of the key link . the model .

  22. 随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。

    The GERT network can solve not only the project time optimization problem in making bridge construction plan , but also the cost optimization in the limit of proper project time and resource .

  23. 以光缆敷设为例,分析阻工现象对工程进度的影响,建立有约束条件的最短工期优化模式,搜索最优目标。钢制板式散热器剖析提示:低温处理能有效地积累分裂期细胞。

    Taking optical fiber cable laying as an example , the effect of work hindrance phenomenon on job progress is analyzed and an optimization model of constrained shortest project period is constructed to search for optimal target .

  24. 运用网络计划技术、关键路径法等方法编制了进度计划,进行了工期优化,编制出了项目的进度计划方案,以便指导项目的实施,保证项目按时完成。

    With the use of network schedule and critical paths methods , workers optimize the time limit and draw up the schedule plan of the project to guide the implementation of the project and ensure the established time .

  25. 在工期优化时,随着关键工作活动时的缩短,一些非关键路线上的工作会转变为关键工作,必须同时缩短其活动时间。

    During the optimization along with shortening of action time of works in critical paths , some work in non - critical paths could be transformed to critical works , and their action time must be shortened at the same time .

  26. 新系统在进度计划的编制方面,将会更能适应国内水电领域的发展要求,对于资源的优化配置、费用的汇总处理、工期优化等方面,有重要的研究意义。

    The system will be more adaptive to the requirement of drawing construction network planning in the field of domestic hydropower engineering . Besides , it also has important research significance for optimal disposition of resources , summary treatment of cost , schedule optimization .

  27. 在资源优化和工期优化的基础上,将质量作为约束条件纳入到工期优化中,建立了在质量和费用约束下的工期模型,体现了进度、质量与成本三大目标相互作用的原理。

    Integrating quality into the schedule as a constraint optimization on the basis of resource optimization and schedule optimization , and eventually established in the quality and cost constraints of the duration model , reflects the interaction among the three main objectives that is progress , quality and cost .

  28. 文章基于网络计划技术,介绍国内外学者在施工项目的工期优化、费用优化、资源优化和综合优化方面的研究成果,并进行比较分析,提出施工项目网络计划优化研究的问题,展望其研究前景。

    Research findings of network planning optimization at home and abroad , including time limit optimization , resource optimization , expense optimization and comprehensive optimization , is introduced and compared . At last , some important problems and the prospect of the study of network planning optimization are analyzed .

  29. 介绍了公路工期成本优化的思路和方法,并提出了公路工程工期成本优化的CAD软件设计方案。

    This article introduces the thought and method of highway engineering time-cost optimization , and puts forward the CAD software design scheme .

  30. 工期成本优化方法在计算机上的实现

    The Implementation of Computer in Delivery time Cost Optimum Methord