岭澳核电站二期

岭澳核电站二期岭澳核电站二期
  1. 依据广东岭澳核电站二期2台1000MW发电机组采用强迫风冷母线国际招标书中的技术条件,进行研究,提出了强迫风冷离相封闭母线的发、散热计算程序;

    The paper introduced the technology research project in international public bidding of 2 × 1 000 MW forced air-cooling enclosed bus for Phase 2 of Guangdong Lingao Nuclear Power Station .

  2. 岭澳核电站二期给水管道流动加速腐蚀的控制与改进

    The Control and Improvement of FAC in LingAo II Feedwater Pipe Work

  3. 岭澳核电站二期工程常规岛主厂房布置设计优化

    Design Optimizations for Conventional Island for Ling'Ao Phase II Nuclear Power Plant

  4. 核发电站,原子能发电站岭澳核电站二期核岛安全壳预应力施工技术

    Construction Technology of Safety Shell Prestress in Ling'ao Nuclear Power Station Phase ⅱ

  5. 岭澳核电站二期汽轮发电机轴承消防系统分析

    Analysis of Turbine Fire Protection System of Ling ' ao Nuclear Power Plant Phase II

  6. 岭澳核电站二期18个月换料燃料管理研究

    Fuel Management Study on 18-Months Fuel Cycle for Ling ' ao Phase-II Nuclear Power Station

  7. 岭澳核电站二期工程项目管理模式选择及实施策略分析

    Project Management Mode Selection & Actualizing Strategy Analysis of LingAo Nuclear Power Project Phase II

  8. 结团絮凝工艺处理染料模拟废水的实验研究岭澳核电站二期凝结水处理系统重大技术改进

    Treatment of Dye Simulated Waste Water by Pellet Coagulation Technical Improvement of ATE System of Ling ' ao Nuclear Power Plant Phase ⅱ

  9. 本文基于岭澳核电站二期的管理实践,给出了工程建设期间核电站运行管理的方案和实践,并对相关环节进行了讨论,对处于相同时期的核电站运行管理具有一定的参考应用价值。

    Details on operational management in Ling ' ao Nuclear Power Station phase ⅱ were presented , which is of value for reference by the nuclear power station in the same period .

  10. 论文以广东岭澳核电站二期基础爆破开挖工程为基础,在现场实施了全程实时爆破振动监测,并对其中四次基岩爆破进行了爆前爆后岩体声波试验。

    In construction site of rock blasting and foundation excavation at Ling ' ao Nuclear Power Station ( LNPS ), Guangdong , China , rock blast vibration has been monitored . And four groups of sound wave tests before and after rock blasting have been conducted .