北京五号
-
北京地铁五号线暗挖施工技术方案选优方法探讨
Methodology of Beijing Metro No.5 Line tunneling construction technology option
-
北京地铁五号线曲线斜拉桥设计
Design of Curved Cable-Stayed Bridge on Beijing Subway Line 5
-
膨润土注浆材料在北京地铁五号线注浆工程中的应用
Application of bentonite injection material in Line No.5 of Beijing Subway Project
-
北京地铁五号线暗挖车站施工方法
Underground excavation method of subway station in the No.5 line subway of Beijing
-
北京地铁五号线炎热季节混凝土拌合物温度综合控制
Temperature controlling of concrete mixture for Subway Line No.5 in Beijing at heat season
-
北京地铁五号线某车站地表变形的有限元分析
The Finite Element Analysis of Surface Deformation of A Station in No.5 Route of Beijing Metro
-
北京地铁五号线项目中期评价研究
Beijing Metro No.5 Line middle estimate
-
北京地铁五号线近接玉蜓桥施工的力学行为研究
Mechanical behavior investigation of the tunnel construction in metro line No.5 adjacent to Yuting Bridge in Beijing
-
北京地铁五号线张自忠路站为大跨暗挖车站,采用浅埋暗挖法施工,对地表沉降控制要求严格。
Reasons , Regularity and Control Measures of Ground Settlement due to Tunnel Excavation by Shallow Mining Method ;
-
基于行为的城市轨道交通客流预测方法研究&以北京地铁五号线客流预测为例
Research of Activity-based Urban Railway Transit Passenger Forecast Model & Beijing Metro Line 5 Passenger Forecast Cast Study
-
北京地铁五号线预制盾构管片的高性能混凝土研究
A study on the high performance concrete for the precast tunnel segments on Beijing metro line No . 5
-
本文简要介绍了北京地铁五号线信号系统与安全门系统的接口,包括逻辑关系及信息传递方式。
The paper gives a brief introduction to the interface between signal system and exit system of Line 5 of Beijing Metro , including the logical relationship and the information transfer mode .
-
北京地铁五号线崇文门站下穿既有地铁一号线区间隧道,车站顶板与区间隧道底板间距2.858m。
Line of Beijing Subway goes beneath the existing No. 1 Line of the interval tunnel of Beijing Subway . The distance between the roof of the station and the bottom board of the interval tunnel is 2 . 858m .