  1. 本论文将模型中负荷优化分配和最优启停机方案确定两个子系统中的优化算法Agent应用于刘家峡水电站的经济运行计算中。

    Thesis this load optimize , assign and not optimum to open , shut down scheme optimization algorithm Agent to confirm two subsystem apply Liujia Gorge economical operation of power station to model While calculating .

  2. 本文用板块构造观点论述了刘家峡水电站库区及坝址构造特点,指出坝基岩体抗滑稳定条件。

    This paper describes the stability analysis of the main concrete gravity dam of Liu-Jia-Xia Hydro-Power Station , Yellow River , China .

  3. 以刘家峡水电站2号水轮机的设计参数为依据,进行三维实体建模。

    Based on the design parameter of NO. 2 hydraulic turbine in Liu Jia xia Hydropower Station , create the 3D entity model .

  4. 刘家峡水电站的泥沙问题,主要是由洮河泥沙引起的,严重威胁着电站的安全运行。

    The issue of sedimentation in Liujiaxia hydropower station is mainly come from the Tao River that shows serious threat against safety operation of the station .

  5. 计算结果显示,本论文建立模型中所采用的算法可以比较好地提高刘家峡水电站的运行效率。

    The result of calculation reveals , this thesis builds and sets up the algorithm adopted in models and improves the operational efficiency of the power station of Liujia Gorge better .

  6. 刘家峡右岸水电站模型试验的光路布置

    Arrangement of Optical Path of Model Experiment of Liujia Gorge Right Bank Hydropower Station

  7. 黄河上游龙羊峡至刘家峡河段梯级水电站建设后鱼类资源变化

    Changes of fishery resources after the construction of cascade hydropower stations from Longyang gorge to Liujia gorge in upper stream of Yellow River