隧洞掘进

suì dònɡ jué jìn
  • Tunnel excavation;tunnel driving
隧洞掘进隧洞掘进
  1. 隧洞掘进机(TBM)电气系统维护

    On Maintenance of Electric system of TBM

  2. 文中介绍了用隧洞掘进机(TBM)在大同塔山矿主平峒掘进施工中采取的安全措施和应该注意的事项。

    This paper introduces the used safety measures and the matters needing attention in construction of tunnel cut by TBM method in Tashan coal mine of Datong City .

  3. 对不良地质条件下采用TBM进行隧洞掘进所遇到的困难进行了分析,就如何实施超前支护(如预灌浆处理、超前锚杆等)工艺和技术要点做了初步探讨。

    Finally , summarizing the problem faced by the construct of the TBM in the tunnel excavation ; and discuss the technics of the forepoling ( pre-grout 、 advanced anchor ) construction .

  4. 隧洞掘进机施工的刀具损耗分析

    Analysis on the wear and tear of the tunnel construction cutter

  5. 长大隧洞掘进机施工洞内运输系统研究

    Study on transportation system of long and large tunnel construction by TBM

  6. 标准药卷光面爆破在隧洞掘进中的应用

    Application of Standard Cartridge Smooth Blasting in Tunnel Excavation

  7. 全断面隧洞掘进机配套出渣列车优化调度的研究

    Study to Dispatch Optimization for Muck Removal Train that Matches Full Face Tunneler

  8. 双护盾隧洞掘进机的原理及其应用

    Principles and Application of Double Shield Tunneling Machine

  9. 浅议全断面隧洞掘进机在引水隧洞施工中的应用

    Discussion on application of tunnel boring machine ( TBM ) to construction of water conveyance tunnel

  10. 隧洞掘进塌方处理及不良地质条件下管棚法超前预支护技术

    Tube Awning Law in Advance Pre-supports and Protections Technology under Tunnel Landslide and Unfavorable Geological Condition

  11. 详细阐述了全断面隧洞掘进机掘进技术要点和质量控制方法。

    This paper expounds in detail the tunneling technical points and quality control methods of TBM .

  12. 弹-粘塑性边界单元法分析及其在隧洞掘进面时空效应中的应用

    Analysis of Elasto-viscoplastic BEM and its Application in Space-time Effect on the Excavation Face of the Tunnel

  13. 全断面隧洞掘进机在引黄工程南干线国际Ⅱ、Ⅲ标中的应用

    Application of full-face TBM on the international tender sections II and III of the southern artery in the Yellow River diversion project

  14. 在某些特定不良地质段进行隧洞掘进时,为了克服地层稳定性差对隧洞施工的不利影响,越来越多地应用超前支护技术。

    The pre-support technologies are applied more and more abroad in order to conquer the bad influences appearing when the tunnels are excavated in bad geologic segments .

  15. 本文在研究隧洞掘进机开挖隧洞出碴及材料运输三种典型方案后,对其调度方案进行了设计计算。

    In this paper , three typical scheme design on mucking and transporting system of tunnel boring machine is studied , and the dispatch of the equipment in .

  16. 掘进机按照对于巷道断面的作用方式可划分为两种:全断面掘进机和部分断面掘进机。全断面隧洞掘进机在引黄工程南干线国际Ⅱ、Ⅲ标中的应用

    There are mainly two kinds of roadheader : Tunnelling Boom Machine ( TBM ) and partial-size tunneling machine . Application of full-face TBM on the international tender sections II and III of the southern artery in the Yellow River diversion project

  17. 深埋长隧洞TBM掘进围岩开挖扰动与损伤区研究

    Study on Excavation Disturbed Zone and Damage Zone in Surrounding Rock of Deeply Buried Long Tunnel by TBM Driving

  18. 穿黄隧洞盾构掘进质量控制中的测量监理管理

    The Management of Surveying Supervision on Tunneling Quality Control of Tunnel Constructed by TBM and beneath the Bottom of Yellow River

  19. 第一期工程方案的关键技术就是如何开凿深埋长隧洞,掘进机的采用使得这一问题得到解决。

    The key technology of the first stage project is how to dig tunnels and this is to be solved by adopting excavators .

  20. 隧洞工程全段面掘进机施工的豆砾石回填灌浆及质量控制

    Backfill Grouting in Pea Gravel Layer behind Lining of Tunnel Constructed by TBM and Its Quality Control