材料清单

  • 网络Bill of Material;BoM;Checklist
材料清单材料清单
  1. 材料清单:请对照清单以保证递交材料的完整。

    Checklist : Please use the Checklist to ensure that you have included all the documents to be submitted .

  2. 最新的CAD系统还能提供准备可用包装,设计图的绘制,材料清单以及最终图纸的工具。

    The latest CAD systems also provide the tools that are needed to prepare permit packages , plot layouts , bills of material and final drawings .

  3. 是摩根士丹利对当前iPhone版本的详细分解,涵盖从无锁版价格到材料清单再到利润空间等内容。

    The second , copied below , is Morgan Stanley 's breakdown of the current iPhone lineup , from unlocked price , through bill of materials , to profit margins .

  4. 通过三维模板及二维工程图的定制,大大提高了使用Pro/Engineer建模的效率,也给二维工程图及BOM(材料清单)的创建带来事半功倍的效果。

    Through customizing 3D template and 2D drawing template , Improving the efficiency of using Pro / Engineer modeling greatly , bringing the result that gets twice the result with half the effort to the establishment of the 2D drawing and BOM ( Bill of material ) too .

  5. 玻璃一跃到了标准现代化材料清单的榜首。

    glass leapt to the top of the list of quintessentially modern substances .

  6. 同时,计算机可以建立一个材料清单的文件。

    Simultaneously ; the computer can build a file containing the bill of materials .

  7. 装箱单(提货单、材料清单)在那里?

    Where is the packing list ( bill of lading , bill of materials )?

  8. 六价铬和镉也已消灭的材料清单。

    Hexavalent chromium and cadmium have also been eliminated from the list of materials .

  9. 最终项目备件清单在收到可靠的定义和材料清单已完成时递交。

    Final project spare parts list is submitted when firm definition has been received and bills of materials completed .

  10. 关于拆除北韩核武装的步骤的谈判曾在北韩准备提交一份本国核材料清单时陷于停顿。

    Negotiations on steps to disarm nuclear North Korea were halted while Pyongyang prepared a declaration of its nuclear materials .

  11. 因此,一种满足中小型企业生产基本需要的物资材料清单管理系统的出现成为众望所归。

    So a small-scale BOM management system is required to meet the basic need of BOM management for those enterprises .

  12. 尽管提交的材料清单信息要求投标人提供完成系统所需的任何规定材料。

    Although the submission of BOM does not absolve the bidder to supply whatever is required to complete the system specified .

  13. 想想你在下一周要做的菜,列出一份你需要购买的材料清单。

    Think through the meals you want to eat during the week , and write a list of all the ingredients that you need to buy .

  14. 平壤上个月开始摧毁其主要的核反应堆,并交出核材料清单,不过人们怀疑公布的核材料并不准确。

    Pyongyang began destroying its main nuclear reactor and handed in its nuclear materials list last month , but there are suspicions the declaration is not accurate .

  15. 应用该技术可自动进行电气焊接件托盘表、电气设备托盘表、材料清单等报表的生成和输出以及数据汇总。

    Using this software can creat the list of the electricity weld tray form , the list of electric electricity equipment tray form and material detailed list automatically .

  16. 为解决特钢企业成本信息准确性差、费用分摊不合理的问题,提出了基于多材料清单的特钢成本管理体系结构。

    To deal with problem of data inaccuracy and incorrect fee allocation , an x-Bill of Material ( xBOM ) - based cost management framework of special steel enterprises was presented .

  17. 针对压缩管道、通风管道、电缆等管道系统的布局特征,开发智能管道系统的布局特征,并实现管道展开与材料清单统计。

    Aiming at the character of compressed pipe , vent-pipe , cable and so on , the user defined features about automatic distribution are constructed the Statistic of material bill is realized .

  18. 更确切的说,需查询材料清单库(比如存储于产品数据管理系统中)以了解传感器和挡风玻璃的特性。

    More precisely , the Bill of Materials ( as stored in a product data management system , for instance ) is queried for the characteristics of the sensor and the windshield .

  19. 介绍了承重托架参数化设计和强度分析的CAD/CAE集成设计系统,它包括三维参数化造型、有限元强度分析及工程图和材料清单自动生成3个子系统。

    A CAD / CAE integrated system for parameter design and structure strength analysis of heavy load frames is introduced in this paper . It includes 3D parameter modeling , finite analysis and engineering drawings automatically generated three subsystems .

  20. 通常,这种顺序靠材料进度清单中所排印的各工种次序来表明。

    This sequence is shown by the order in which the trades are printed in the bill of quantities .

  21. 六方会谈已经进行了很长时间。所有参与国的首席谈判代表这一次将在北京开会,争取批准一项计划,用于核实北韩去年6月提交的北韩核项目材料及活动清单的真实性。

    All six heads of delegations to the long-running talks are to convene in Beijing to approve a verification plan for the declaration of its nuclear holdings and activities North Korea made last June .

  22. COATS会将订单流“翻译”为制造材料列表(物料清单,BillofMaterials)和其他指令,这些内容通常被转发到全球相应的IBM制造工厂。

    COATS " translates " the flow of orders into manufacturing material lists ( Bill of Materials ) and other instructions , which are then forwarded to appropriate IBM manufacturing plants worldwide .

  23. 投资控制模块实现对投资的严密管理,主要包括设备清单审核和智能化工程材料与设备采购清单的管理。

    Investment control module achieves tight management of investments . It mainly includes equipment list review , list of intelligent building project materials and equipment procurement .