防洪库容

  • 网络flood control storage
防洪库容防洪库容
  1. 以长江支流乌江武隆站所建立的洪水随机模型为原型,应用统计试验方法初步研究了随机模拟中模型及参数不确定性对推求设计防洪库容精度的影响。

    Assuming that the population model of flood stochastic process is known , the effects of uncertainty of simulating model and parameters estimated on the precision of design flood control storage is preliminarily analysed by Monte Carlo method .

  2. 待建的13项大工程共有调节和防洪库容400亿m3,如及时兴建和调度得当,可增加较大防洪能力。

    The proposed thirteen large hydro projects on the tributaries with regulating and flood control reservoir capacity of 40 billion cubic meters in total could enhance more flood control capability .

  3. 支流防洪库容对防洪区的洪灾风险影响研究

    Effect of Tributary Reservoir Capacity on Flood Risk in Protected Area

  4. 随机模拟在水库群防洪库容设计中的应用

    Application of Random Simulation in Flood Control Volume Design of Reservoir Group

  5. 蓄滞洪区利用与减灾研究百色水利枢纽防洪库容的确定

    Determination of flood storage capacity of the Baise water resources pivotal project

  6. 推求水库设计洪水和防洪库容的一种方法

    A method of Calculating Design Flood and Flood Control Capacity or a Reservior

  7. 中小型水库调洪计算,如果设计洪水过程线为概化五边形模型,则防洪库容和相应的最大下泄流量可通过解析计算求得。

    In the flood regulating computation of medium-minor reservoir ;

  8. 作者提出,应分别计算前、后期设计洪水,取防洪库容大者来确定水库的防洪规模,既合理且经济。

    Author suggestes that design flood , earlier or later , should be computed separately .

  9. 基于库群防洪库容补偿调度的水库汛限水位动态控制

    Dynamic control of reservoir limited flood level on the basis of flood control reservoir capacity compensation regulation

  10. 通过不同防洪库容方案的技术经济指标比较,推荐经济合理的防洪库容规模。

    By comparing the technique-economy index of different flood-control-storage scheme , recommended the economic and reasonable size of flood-control-storage .

  11. 不同林地类型土壤水库的库容组成,均表现为兴利库容>死库容>防洪库容。

    Capacities of forest soil reservoir in different forest lands follow the rule , storage capacity > dead capacity > flood control capacity .

  12. 本文研究了一种依据剩余洪量特性推求水库设计洪水和防洪库容的方法。

    The author studies a method of calculating design flood and flood control capacity of a reservior according to the characteristics of residual flood volume .

  13. 通过计算给出了各子河段动静防洪库容关系曲线,然后讨论了动防洪库容计算步骤,最后给出了与数学模型计算的实例比较。

    Relationship curves between the dynamic flood control capacity and the static flood control capacity are given out and the calculation processes are brought forth .

  14. 模型在湖南省某大流域水库群防洪库容的设计中得到了应用,并取得了较好的效果。

    The model has been used and is very effective in design of flood control reservoir group in a large watershed in Hu ′ nan Province .

  15. 防洪库容分别为62.79、49.81和40.08mm,分别是裸露地的1.52、1.21、0.97倍。

    Flood control capacity in them was 62.79 , 49.81 and 40.08 ? mm , 1.52 , 1.21 and 0.97 times as high as that in the CK respectively ;

  16. 小浪底水库死库容淤积完后,需要三门峡水库配合运用的防洪库容将更大。

    When the dead storage capacity of the Xiaolangdi Reservoir is filled up , the storage capacity for flood control need to be cooperated with the Sanmenxia Reservoir will be bigger .

  17. 大宁水库建于1985年,设计防洪库容3600万m~3,为中型水库,是永定河的滞洪水库之一。

    Daning reservoir was built in 1985 , and the design flood storage capacity is 36000000 m3 , which is a middle size reservoir , one of the retarding reservoirs of Yongding river .

  18. 通过研究,将水库的调洪库容占总库容的百分比和防洪库容与特征洪量的比值作为峰量控制类型的判断指标。

    Then the paper chooses the percentage of flood storage capacity and total capacity of reservoir and the ratio of flood storage capacity to the feature volume of reservoir as judgement indexes of peak control ;

  19. 并针对一个实际水库,考虑防洪库容的滞洪削峰作用,初步研究了水库防洪全面风险率模型应用问题。

    The practical calculation model of the overall risk is presented which is used to consider reservoir possessing flood detention and flood flat topping and to determine the highest flood regulation level by means of storage routing .

  20. 水库应当按照防洪规划的要求留足防洪库容。

    Reservoirs should keep adequate storage capacity for flood control according to the requirements of flood control planning .

  21. 防洪预报调度是根据水库洪水预报的一定精度和预见期,在洪水到来之前腾出库容以蓄纳即将发生的洪水,取得增加一部分防洪库容的作用。

    Anti-flood forecasting regulation is according to some degree of precision and predicting period of flood forecasting of reservoir , before the coming of flood to make room for the coming flood , to have the function to improve the anti-flood capacity .