西安地铁

  • 网络Xi'an metro
西安地铁西安地铁
  1. 西安地铁项目客流量预测及运营经济效益分析

    The Forecasting of Xi'an Metro Traffic and Economic Analysis of Operations

  2. 西安地铁2号线通过地裂缝的结构及防水设计

    Structural and waterproof design of Xi'an Metro Line No.2 crossing earth crevasse

  3. 西安地铁建设对商业房地产的影响研究

    Research on Effect of Subway on Commercial Real Estate Value in Xi'an

  4. 水环境下地裂缝对西安地铁的影响

    The Effect of Fissure under Ground Water on the Subway of Xi'an

  5. 西安地铁施工盾构选型分析

    Analysis on selection of metro construction shield machine in Xi'an

  6. 西安地铁工程项目实施的组织管理策划研究

    The Implementation Organization Planning Study of the Xi'an Subway Project

  7. 西安地铁2号线地质勘察总体工作探讨

    Discussion on the Overall Geological Survey for Metro Line 2 in Xi'an

  8. 浅谈西安地铁施工高处坠落事故的预防

    On prevention of falling down from high places in Xi'an subway construction

  9. 西安地铁1号线区间隧道施工风险评估初探

    Preservation Study of Risk Evaluation in Xi'an Metro Line 1 Section Tunnel Construction

  10. 西安地铁明挖车站基坑工程的支护型式选择

    On Choice of Foundation Pit Support Types of Open-cut Metro Station of Xi'an Metro

  11. 并结合西安地铁二号线工程,给出了该方法的应用算例。

    An example was given combined with No.2 Line of Xi ′ an subway .

  12. 西安地铁二号线地裂缝段防水设计探讨

    Study on Waterproofing of Xi'an Metro Line 2 on the Section with Ground Fissures

  13. 最后给出西安地铁1号线的应用模型实例。

    Finally , its application model to Xi ' an Metro Line 1 is simulated .

  14. 基于西安地铁2号线沿线商业效益综合评价研究

    The Comprehensive Evaluation Study of Business Benefits Based Along the Metro Line 2 in Xi'an

  15. 西安地铁穿越地裂缝带线路与轨道工程方案研究

    Study on the Project Plans of the Xi'an Subway Passing through the Earth Surface Crack Zone

  16. 西安地铁区间结构小角度穿越地裂缝有限元计算与分析

    Finite Element Calculation and Analysis of Xi'an Metro 's Interval Structure Crossing Ground Fissures through a Small Angle

  17. 地铁工程地质灾害危险性综合评估定量方法&以西安地铁一号线为例

    Quantification Grading Method in Subway Engineering Risk Assessment of Geological Disasters & Taking No.1 Subway in Xi'an as an Example

  18. 这名姓陈的安保人员,以及西安地铁运营公司的其他七名员工,

    The security guard , surnamed Chen , and seven other employees from the company that operates the subway system in Xi'an

  19. 西安地铁项目已正式通过国家批准,其中西安地铁二号线现已开工建设。

    Xi ' an Subway Project has gotten the official approval from the State . Subway Line 2 has started building .

  20. 文中以西安地铁2号线某车站为主要研究对象,验证了该物理模型的正确性。

    We check the correctness of the physical model on the main object of Line No.2 of Xi ' an Metro .

  21. 中国西北部的陕西省将加快高速铁路建设,包括西安地铁和渭河平原城际铁路网。

    Northwest China 's Shaanxi province will speed up the construction of high-speed railway , Xi'an subway and Weihe Plain intercity railway networks .

  22. 据西安地铁官方表示,该女子是因与其他乘客争吵,并在车厢内制造骚乱而被拖离的。

    According to subway officials in Xi'an , the woman was removed for quarreling with other passengers and creating a disturbance in the carriage .

  23. 城市居住环境下高空坠物及建筑设计防坠措施研究浅谈西安地铁施工高处坠落事故的预防

    Research on High-altitude Falling and Architectural Falling-free Measures in Urban Residential Environment ; On prevention of falling down from high places in Xi'an subway construction

  24. 在此基础上,着重就西安地铁一号线沿线地裂缝活动特征及其影响进行了分析。

    Basing on that , the activities characteristics and the impact of the ground fissures of Xi ' an Subway along the line were analyzed .

  25. 并运用计算机对定价模型进行运算,结合西安地铁对模型进行实证研究,从而预测未来年度合理的票价水平。

    Use computer to run the pricing model , combination with xian subway model for empirical research , thus to predict reasonable fare level in future yeas .

  26. 论文研究的结果表明,西安地铁2号线对沿线住宅价格的影响半径约为2000米。

    Paper the results of the study show that Xi ' an Metro Line 2 of the impact of housing prices along the radius of about 2000 meters .

  27. 本文以西安地铁建设项目为研究背景,结合组织策划理论,进行以下的研究工作。

    This paper takes the Xi ' an subway project as the research background , combining the organization theory in order to carry on the following research works : 1 .

  28. 最后通过对凭借优秀的成本管理而盈利的西安地铁车站工程项目进行剖析,探讨了这一项目在施工过程中的成本管理对策与成果。

    Finally , through analysis on Xian subway station project with excellent cost management , the paper discusses the measures and results of cost management and control in such a project .

  29. 目前,西安地铁正处建设中,地铁线路穿越了数条地裂缝,地裂缝活动将对地铁施工和安全运营产生不利影响。

    Now , Xi ' an Subway is under construction . A number of ground fractures are crossed by the subway , which will bring adverse effect to the subway construction and operation .

  30. 为了最大程度地减小西安地铁二号线工程建设对古建筑的影响,提出了合理的古建筑加固方案和工程减振措施。

    Also , a reasonable heritage building reinforcement plan and engineering anti-vibration measures were proposed , so as to reduce effect of Xi'an subway second line project construction on heritage buildings to the lowest degree .