箕斗装载硐室
- 网络Skip loading chamber
-
立井延深箕斗装载硐室施工新途径
New Way of Deepening Skip Loading Chamber Construction in Shaft
-
深立井超大型箕斗装载硐室快速掘砌技术
Deep Shaft Speed Excavation and Masonry Construction with Super Sized Skip Loading Chamber
-
济宁二号矿箕斗装载硐室及下部井筒等施工
Skip loading chamber and bottom shaft construction in Jining No.2 coal mine
-
首山一矿主井箕斗装载硐室施工技术
Skip-loading Room Construction of Main Shaft in Shoushan 1 ~ # Mine
-
庞庄矿副井改主井时箕斗装载硐室和煤仓的施工方法
Construction method of skip loading chamber and coal bin under rebuild from
-
大型箕斗装载硐室施工
The Construction of the Large_scale Skip Loading Pocket
-
张北主井箕斗装载硐室的施工
Construction of Zhangbei Main Shaft Ship Loading Cavern
-
十一矿新主井箕斗装载硐室施工工艺优化及应用
Optimization and Application for the Construction Technology in No , 11 Mine New Main Shaft Skip Loading Chamber
-
风井延深工程中的箕斗装载硐室设计较复杂,施工难度大且占用建井工期时间较长。
The skip loading chamber in the air shaft deepening project was designed very complicated , very difficulty to construction ;
-
结合具体施工条件,对主井箕斗装载硐室施工方案进行了分析,选择了适宜的施工方案。
This paper associates with specific construction condition , analyses the construction scheme for main shaft pan loading chamber , and chooses proper construction scheme .
-
本文介绍了箕斗装载硐室施工方案的优化、施工工艺及施工难点,为在软岩中安全、优质、快速建成大断面硐室积累了新经验。
This paper introduced the optimized scheme , techniques and difficulties in skip loading pocket construction . It provided the experience for rapid construction of large cross section chambers in soft rocks .