沙湾水电站
- 网络shawan hydropower station
-
大渡河沙湾水电站开发方式及其长尾水渠水力学特性研究
Study for Development Method and Hydraulic Characteristics of Long Tailrace on Shawan Hydropower Station of Dadu River
-
沙湾水电站深基坑塑性混凝土防渗墙应力及变形研究
Study on Stress and Deformation of Plastic Concrete Cutoff Wall at Deep Foundation Pit of Shawan Hydropower Station
-
沙湾水电站厂房后坡变形体地表三维监测分析
3D Monitoring Analysis of Slope Deformation Body behind Shawan Hydropower House
-
河水猛冲着岩石堤岸。大渡河沙湾水电站尾水渠渠堤渗流场特征及稳定性分析
Characteristics of Seepage Field and Stability Analysis for Tailrace Canal Bank on Shawan Hydropower Station of Dadu River
-
沙湾水电站左岸坝肩地窗式防渗方案优化计算与分析
Optimal Simulation and Analyzing to " Lower Window " Type Seepage Control Scheme in Left Abutment of Shawan Hydropower Station
-
采用深度平均渗流模型结合2维立面渗流模型,对沙湾水电站左岸坝肩“地窗式”防渗方案进行了渗流量、渗流场及渗透坡降的计算;
Combining depth-averaged numerical seepage flow model and 2-dimensional profile seepage flow model , seepage rate , seepage velocity field and hydraulic gradient of seepage control work in left abutment of Shawan hydropower station have been obtained .
-
沙湾水电站运用了以水库代替沉沙池的方案,通过调度水库运行方案,达到控制水库泥沙冲淤平衡的目的,从而保证设计所需长期有效的日调节库容。
The Shawan hydroelectric power station utilized has replaced the settling basin by the reservoir the plan , through dispatched the reservoir movement plan , achieved controlled the reservoir silting to flush the silt balance the goal , thus the guarantee design needed the long-term effective date adjustment storage capacity .