昌山
昌山
-
昌山水电站枢纽工程闸坝工作门方案设计
Lock dam work gate scheme design of the Changshan hydropower station pivotal project
-
根据昌山电站的实际情况,进行闸坝工作门方案的比选,确定采用液压翻板闸门。
According to the actual situation of the Changshan hydropower station , the authors compared the lock dam work gate schemes and determined using hydraulic flap gate .