施工总进度计划

施工总进度计划施工总进度计划
  1. 施工总进度计划优化方法的探讨及计算机应用

    Optimum method of overall construction schedule and its computer application

  2. 这些控制包括:设计前准备阶段进度控制,设计阶段进度控制,编制施工总进度计划,施工阶段工程进度控制。

    These are the controlling preparation schedule after construction design , the controlling design stage schedule , the editing total construction schedule I controlling constructing sage .