整体安装

  • 网络Overall installation;monolithic installation
整体安装整体安装
  1. 洋河大桥120m主跨钢管混凝土系杆拱整体安装工艺

    Integral Installation Technology for Steel Tube Concrete Tied Arch of 120 m Mainspan of Yanghe Bridge

  2. 高耸钢结构整体安装应力的分析计算

    Analysis and calculation of high steel structure stress when installed completely

  3. 即可以整体安装,也可以作为独立部件单独提供。

    It is available mounted or as a separate item .

  4. 本文介绍一种新型电路板的设计、制作和整体安装。

    We designed a new self-made electric circuit board for physical experiment .

  5. 整体安装、一次浇注法在冷床改造安装中的应用

    Application of Integral Installing with Once Forming in Reconstruction Installation of Cooling Bed

  6. 三峡工程右岸电站压力钢管凑合节的整体安装

    The installation of the transition pressure pipe union in the Right Bank Hydropower Station of Three Gorges Project

  7. 熔断器的安秒特性主要由熔丝、外弹簧作用力与整体安装位置决定。

    The ampere-second property of the fuse is mainly determined by fuse wire , outer spring function force and the whole install location .

  8. 焊接球网架的施工杆件下料加工值的计算以及网架网格尺寸的定位是保证网架整体安装质量的主要前提条件。

    Calculation on baiting of truss of welded ball grid and setting of grid size are premises for assuring the quality of grid unity installation .

  9. 这些多流道转向阀门整体安装在Y形管道上,最大限度减少可能产生淤积的死角(请参阅阀座插图)。

    These multi-port diverter valves are integrally mounted to Y-pattern pipe to minimize dead space where material can accumulate ( refer to seat illustration ) .

  10. 海上风电结构一体化安装技术实现了基础结构与塔筒及风机的海上整体安装,与传统的风电结构安装方法相比有较大优势。

    Integrated installation technology with offshore wind-power structure achieved the overall installation of foundation and wind turbines . This new installation method had greater superiority than the traditional installation method .

  11. 桅杆式起重机整体安装技术是建设部提出的建筑业重点推广应用的十项新技术之一,在建筑工程领域应用广泛。

    The integrated installation technique of mast-crane , as a wide used installation technique in the civil engineer filed , is one of the ten latest technologies of extended and applied emphatically in civil engineer put forward by the Ministry of Construction .

  12. 机器为整体结构安装、检修方便。

    As integral machine , feature convenient erection and repair .

  13. 大型龙门吊的建造方法采用分段预制、分段运输、整体就位安装。

    Large-scale construction methods used are prefabricated sub-assembly , sub-transport , whole installation in place .

  14. 钢箱梁长大节段整体制造安装施工技术

    Manufacturing Construction Techniques for Monolithic Fabrication and Installation of Long and Large Steel Box Girder Blocks

  15. 液压系统与阀门本体可以是整体式安装,也可分开装。

    Hydraulic system and the valve main body may be the integral-type installment , also may separate the installment .

  16. 54×48米机库网架结构民航201机库网架整体提升安装法

    A 54 x 48m space truss roof hangar integral hoisting technology of grid frame of hangar # 201 CAAC

  17. 民航201机库网架整体提升安装法超高层建筑整体爬升外脚手架的设计与施工

    INTEGRAL HOISTING TECHNOLOGY OF GRID FRAME OF HANGAR # 201 CAAC Design and Construction of An External Integral Lifting Scaffold for Super-highrise Buiding

  18. 鞍钢工业结构公司成立于1985年,主要承接大型工业厂房钢结构整体制作安装,是东北地区最大的金属结构制品生产企业。

    Anshan steel construction company was established in 1985 . It mainly carries on the manufacture and installation of large-scale industry factory steel construction .

  19. 然而,需要打开圆荚体滤波器除去进气整体水平安装,工作最好以手动车,因为他们通常需要更高的转速为了达到最佳的运作效果。

    Open pod filters however requires the removal of the whole standard air intake to install , and work best with manual cars , as they generally need higher revs in order to work optimally .

  20. 通过对深圳市民中心大屋盖钢结构整体提升安装,介绍大屋盖钢结构提升点位布置的原则和应注意的问题。

    The principle of arranging the lifting spots of steel structure for a large roof , as well as the problems that merit attention are introduced by way of the integral lifting and erection of the large roof steel structure for Shenzhen Citizen Center .

  21. 如果在设备或者设备部分整体功能的安装过程中需要完成一个特定设置或配置,使用这些ACL或API来完成。

    If a particular setting or configuration is required to be completed during installation of the appliance or as part of overall functioning of the appliance , use these CLIs or APIs to do so .

  22. 沉箱&箱涵整体浮运安装方法的分析

    Analysis of whole floating installation method of caisson and box culvert

  23. 海上风力发电机组的整体软着陆安装

    Overall Soft Landing Installation of Offshore Wind Turbine

  24. 主轴采用两端两点支承且其组件采用整体吊装方式安装和拆卸;

    The chief shaft was supported by two fulcrum bearings at both the two ends , and its component was entirely assembled and dismounted .

  25. 选用大型吊车进行整体吊装、安装,减小了安装组对的累计误差,缩短了施工周期,保证了施工质量。

    The accumulative errors were reduced during assembling with whole body lifting by using a heavy-duty hoist which shortened the working hours and guaranteed construction quality .

  26. 根据港深西部通道香港后海湾大桥钢箱梁的特点,概要介绍了钢箱梁长大节段整体制造、安装施工技术。

    With reference to the technical features of steel box girder of Hau Hoi Wan Bridge , Hongkong-Shenzhen Western Corridor , the construction techniques for monolithic fabrication and installation of long and large blocks of the box girder are described in a summarized account .

  27. 钢结构连廊高空整体滚动跨越移位安装技术

    High-level Integral Rolling-crossing-shifting Installation Technology for a Steel Structure Gallery

  28. 东海大桥高桩承台整体钢套箱安装

    Installation of Integral Type Steel Boxed Cofferdams for Elevated Pile Caps of Donghai Bridge

  29. 针对武蒲段设计要求,经科研攻关解决了导线超拉工艺,力学法计算整体吊弦及其安装工法。

    Aiming at the demand of design of Wu - Pu Section , developed the wire overrunning technology , calculate the whole dropper and its installation technique .

  30. 充气式密封塞以整体式封堵,安装方便快捷,能快速在管道或阀门内部空腔进行隔离,起到防异物和密封作用。

    The inflatable closure plug is characterized by integral closure , easy assembly , quick air isolation in pipelines or valves , foreign body resistance function and sealed effect .