合龙

hé lóng
  • closure;closure (of a dam, dyke, etc.);join the two sections of a bridge, etc;join two sections of a bridge,etc
合龙合龙
合龙 [hé lóng]
  • [closure (of a dam, dyke, etc.);join two sections of a bridge,etc]∶桥梁、堤、坝等从两端施工的工程在中间接合

  • 大堤即将合龙

合龙[hé lóng]
  1. PC连续梁桥施工控制与合龙参数分析

    Construction Control of PC Continuous Beam Bridge and Analysis of Closure Parameter

  2. V型墩连续刚构桥基础刚度及合龙方案的探讨上部结构、筏板、地基共同作用中的基础刚度影响研究

    Study of foundation stiffness and closure scheme on continuous rigid frame bridge with V-type piers

  3. 本文研究了预应力混凝土V形支撑连续刚构桥的施工模拟分析、施工控制、合龙技术及其受力性能分析。

    The construction simulation analysis , construction control technology , closure technology and its performance of the prestressed concrete V-shaped pier continuous rigid frame bridge were studied in this thesis .

  4. 小浪底水利枢纽工程于1997年10月28日胜利完成截流,从龙口进占到戗堤合龙历时40h。

    The closure with of Xiaolangdi hydraulic key project was completed successfully on October 28 , 1997 with processing duration of 40 hours .

  5. 其中跨和2个边跨各设1个长度2m的合龙段,随着边跨和中跨的合龙,结构先后完成2次体系转换。

    On the main span and two side spans of the main bridge , there is each one closure segment , 2 m in length , and along with the closing of the spans , the Bridge has completed two time of structural system transformation .

  6. 杨浦大桥主桥结构形式为双塔双索面全漂浮体系迭合梁斜拉桥,主跨602m,其钢梁安装、斜索张拉和桥面合龙技术是整个工程的关键。

    Shanghai Yangpu Main Bridge with 602m span is a cable & stayed bridge with twin towers , twin cable planes and entirely floating superposed beams . The installation of steel girders , the tensioning of cables and the closure of decks constitute the key points to the entire project .

  7. 官洋溪特大桥边跨合龙方案研究

    Study of Closing Schemes for Side Spans of Guanyang Creek Bridge

  8. 复杂水文条件下围涂工程的龙口合龙技术

    Dike Closure Technology in Reclamation Project Under the Complex Hydrological Condition

  9. 多跨连续梁的合龙设计

    Design of the Closure-process in the Construction of Multi-span Continuous Girders

  10. 连续刚构桥合龙顶推力的确定

    The confirmation closure jacking force of continuous rigid frame bridge

  11. 连续梁桥合龙方案对施工控制的影响

    Influence of Girder Joint Scheme of Continuous Girder Bridge on Construction Control

  12. 堵口围堰施工及拆除沿海堤坝工程的合龙施工

    Construction and Removal of Cofferdam Closure Construction for Offshore Dykes

  13. 多跨连续刚构桥构造分析及合龙技术研究

    Study on Structural Analysis and Closure Technic of the Multi-span Rigid-frame Bridge

  14. 沿海堤坝工程的合龙施工堤防工程老化指标之评定

    Closure Construction for Offshore Dykes Evaluation on Ageing Index of Embankments Works

  15. 东海大桥主通航孔合龙段施工工艺研究

    Construction Technology Study on Connection of Main Navigation Span in Donghai Bridge

  16. 对于大跨径斜拉桥的施工控制来说,中跨合龙阶段最为重要。

    For long-span cable-stayed bridge construction control , mid-span closing most important .

  17. 特大连续梁桥合龙方法研究

    Study on the Close Up Method for Extra Long Continuous Beam Bridge

  18. 预应力混凝土连续梁桥主桥合龙施工技术

    Closuring Construction Technology of Main Bridge for Prestressed Concrete Continuous Girder Bridge

  19. 某刚构-连续组合箱梁桥非设计合龙温度下合龙技术

    Closure Technology Under Undesigned Temperature of a Rigid Frame-continuous Combination Beam Bridge

  20. 箱形拱桥无支架单基肋碰撞合龙吊装技术

    The box arched bridge without support single base rib closure lift technology

  21. 影响预应力混凝土连续梁桥合龙阶段施工的若干问题分析

    Analysis of affecting construction during closing of prestressed concrete continuous girder bridge

  22. 武汉军山长江公路大桥钢箱梁合龙技术

    The Joining Technique of Wuhan Junshan Yangtse Rive Highway Bridge Steel Box Girder

  23. 沈阳市富民桥边跨及中跨合龙施工技术

    Closure Construction Techniques for Side and Main Spans of Fumin Bridge in Shenyang

  24. 高墩大跨预应力混凝土桥桥式方案及合龙顺序选择

    Selection of Structural Types and Closure Sequences for Long-Span and High-Rise Pier PC Bridge

  25. 合龙方案对大跨连续梁桥施工控制的影响研究

    Influence of Different Girder Joint Schemes of Long-span Continuous Bridge 's on Construction Control

  26. 桥梁两边合龙要花好几天。

    The connection of the two halves of the bridge will take several days .

  27. 重庆石板坡长江大桥复线桥主跨的合龙

    Closing of Main Span of Double-Line Bridge of Shi-banpo Changjiang River Bridge in Chongqing

  28. 连续&刚构组合体系梁桥合龙方案研究

    Study on Closure Proposal for Tie Beam Bridge with Combination of Continuous Rigid Frame

  29. 刚构连续梁高温合龙处理措施与体会

    Treatment Measures and Experience in Making High Temperature Closure of Rigid Framed Continuous Girders

  30. 京杭运河特大桥主桥连续箱梁合龙关键施工技术

    Key Closure Construction Techniques for Continuous Box Girder Bridge of the Grand Canal Bridge