阐述了丰城电厂300MW机组热控设备存在的问题及采取的改造措施。
The existing problems and retrofitting measures of thermal control equipment of300MW unit in Fengcheng power plant are elaborated .
-
通过分析计算,丰城电厂660MW超临界机组选择35%容量的两级串联旁路系统可以满足所要求的各项功能,实现较好的机炉匹配,满足机组的冷、温、热、极热态启动要求。
According to the analysis and calculation , the two-stage series bypass system with 35 % capacity in Fengcheng Power Plant can meet all the operation requirements and realize the matching between boiler and turbine effectively .
-
浅谈丰城电厂热控设备的改造
Simple Introduction to the Retrofit of Thermal Control Equipment of Fengcheng Power Plant
-
丰城电厂4号机组炉前系统化学清洗
Chemical cleaning of Boiler-front system for unit № 4 at Fengcheng Power Plant
-
丰城电厂引风机电机低/高速切换故障的处理
The Treatment of ID-motor Low / High Speed Change-over Fault in Fengcheng Power Plant
-
江西丰城电厂二期扩建项目进度管理研究
Study on Schedule Control of Two Phases of Expanded Project of Jiangxi FengCheng Electric Power Plant
-
丰城电厂2号机组抗燃油酸值超标原因分析
Cause analysis of over-proof acid value for fire-resistant oil of unit No.2 in Fengcheng Power Plant
-
江西省丰城电厂二期扩建工程项目管理后评价研究
Study on Post-Evaluation of Project Management for Fengcheng Power Plant Phase ⅱ Expansion Project in JiangXi Province
-
丰城电厂1~4号循环水泵电机线圈温度异常分析及处理
Analysis and Treatment No.1 - 4 Circulation - water Pump Electric Machine Coil High Temperature Unusual in Fengcheng Power Plant