丰城电厂

丰城电厂丰城电厂
  1. 阐述了丰城电厂300MW机组热控设备存在的问题及采取的改造措施。

    The existing problems and retrofitting measures of thermal control equipment of300MW unit in Fengcheng power plant are elaborated .

  2. 通过分析计算,丰城电厂660MW超临界机组选择35%容量的两级串联旁路系统可以满足所要求的各项功能,实现较好的机炉匹配,满足机组的冷、温、热、极热态启动要求。

    According to the analysis and calculation , the two-stage series bypass system with 35 % capacity in Fengcheng Power Plant can meet all the operation requirements and realize the matching between boiler and turbine effectively .

  3. 浅谈丰城电厂热控设备的改造

    Simple Introduction to the Retrofit of Thermal Control Equipment of Fengcheng Power Plant

  4. 丰城电厂4号机组炉前系统化学清洗

    Chemical cleaning of Boiler-front system for unit № 4 at Fengcheng Power Plant

  5. 丰城电厂引风机电机低/高速切换故障的处理

    The Treatment of ID-motor Low / High Speed Change-over Fault in Fengcheng Power Plant

  6. 江西丰城电厂二期扩建项目进度管理研究

    Study on Schedule Control of Two Phases of Expanded Project of Jiangxi FengCheng Electric Power Plant

  7. 丰城电厂2号机组抗燃油酸值超标原因分析

    Cause analysis of over-proof acid value for fire-resistant oil of unit No.2 in Fengcheng Power Plant

  8. 江西省丰城电厂二期扩建工程项目管理后评价研究

    Study on Post-Evaluation of Project Management for Fengcheng Power Plant Phase ⅱ Expansion Project in JiangXi Province

  9. 丰城电厂1~4号循环水泵电机线圈温度异常分析及处理

    Analysis and Treatment No.1 - 4 Circulation - water Pump Electric Machine Coil High Temperature Unusual in Fengcheng Power Plant