mk5

-
It was found during field monitoring that in MK5 project , not all the storm deposition pools are marked with warning symbols , and some warning sections of places with excavated subgrade and excavated storm conduit are missing with gaps .
现场监理过程中发现,在整个mk5工程中,雨水沉淀池未全部设置警示标志,路基开挖地方和雨水管道开挖地方警示地段有遗漏,出现缺口。