leadtime
- 投产准备阶段
-
The development cost and leadtime of the foreign aeroengine are introduced .
概述了国外航空发动机研制费用和周期的情况;
-
Continuously improvement in shortening the order leadtime and purchasing method .
持续改进,不断探讨订货周期的缩短及订货方式的改进。
-
Models for Multi-Echelon Distribution Inventory System with Random Leadtime and Stochastic Demand
随机提前期随机需求条件下的多级分销系统库存模型
-
We are quite concern supplier 's samples / goods delivery leadtime and production capacity .
我们非常关心供应商的样板及货的交货期,以及生产能力。
-
Apparently , this negotiate mechanism is a real option on leadtime .
显然,这种谈判机制是关于提前期的实物期权。
-
Leadtime - Contingent Pricing under Response Time Uncertainty
响应时间不确定下的交货期相关定价研究
-
Continuously improve supply leadtime and flexibility .
持续改进供应周期和弹性。
-
This paper is concerned with the problem of optimally designing the leadtime in a stochastic serial production system .
利用基于扰动分析的随机优化算法研究了随机串行生产系统生产提前期计划的优化设计问题。
-
The techology step leadtime period is the base for leadtime period calculation .
工艺步骤提前期是提前期计算的基础。
-
Leadtime must be45 days maximum from received LC upto port of origin .
交货期:收到信用证后45天内到达产地港口。
-
Without method to assess its affection on the inventory cost , it is impossible to quantify the value of leadtime .
在采购定点过程中,缺乏评价采购提前期对库存成本影响的方法,提前期长短的价值无法实现量化。
-
The technologies of cost and leadtime reduction for developing aeroengine in foreign are described , including demonstrated technology ," common " technology , design optimization technology and concurrent engineering .
从高比例继承和多领域通用2方面,重点介绍了在国外航空发动机研制中降低费用、缩短周期所采用的成熟技术,同时介绍了优化设计技术和并行工程技术。
-
Moreover , supply flexibility contained the flexibility to re-configurate supply chain strategically and the capacity flexibility and leadtime flexibility tactically .
这种供应柔性由战略层上重构供应链的柔性和战术层上的产能柔性与提前期柔性组成,构成全文的总体研究架构。
-
An ECU with rapid control prototype ( RCP ) ability is developed for fuel-cell system control , which greatly reduce the leadtime in the development of related following controls .
作者以满足燃料电池系统的研究和控制要求为目标,以实现快速控制原型(RCP)能力为核心设计了ECU,大大缩短了后期相关控制的开发周期。
-
After determining a component delivery due-date but before execution , buyer observed demand changing and want to modify the delivery leadtime to expedite or postpone .
采购商在确定一个产品的交付提前期后,在执行之前观察到需求发生变化,把交付到期日修改到比原定时间提前或延缓。
-
Buyer burdens a proportional of cost to build leadtime flexibility and encourages supplier execute option on leadtime so that response to demand uncertainty and share the risks of component inventory .
采购商通过承担一定比例的提前期柔性成本来换取供应商执行提前期柔性的期权,以便响应需求不确定性并分摊有关分零部件的库存风险。
-
Due to the long leadtime , variation of market demand and transportation time is a big challenge on inventory management . Without mathematical analysis on the influencing factors , S company still sets its inventory strategy mainly based on the experience of managers , leading to low efficiency .
进口零件采购周期长,市场需求和运输时间波动对库存管理带来严峻挑战;而S公司目前库存设定仍然主要依靠管理人员的经验进行决策,缺乏对影响因素的数理分析,决策效率较低。