Yanggao Road

Yanggao RoadYanggao Road
  1. Design of Foundation Pit of Protection Segment of Grade Separation Metro under Yanggao Road in Century Avenue

    世纪大道杨高路下立交地铁保护段基坑设计

  2. This paper suggests a semi theoretical method to calculate its displacement , based on the analysis of measured data from Yanggao road station of Shanghai metro line ⅱ .

    本文针对这一问题,通过对上海地铁二号线杨高路地铁车站大量布点实测数据的分析,结合理论推导得出一种计算地铁车站诱导缝位移的方法。

  3. The papar introduces that the application of shield construction method into underground tunnel for Shanghai NO. 2 subway from Yanggao Road to the Central park .

    介绍了盾构施工方法在上海地铁2号线杨高路至中央公园站地下隧道中的应用。