水塔

shuǐ tǎ
  • water tower
水塔水塔
水塔 [shuǐ tǎ]
  • [water tower] 作为贮水池用的圆柱式封闭蓄水池

水塔[shuǐ tǎ]
  1. 这个水塔上下有50米。

    The water tower is fifty metres high .

  2. 基于西门子PLC的水塔水位自动控制系统

    Automatic Control System for the Water Tower Based on Siemens PLC Luoyang Institude of Science and Technology

  3. 防老剂RD脱水塔腐蚀原因分析及防治措施

    Cause Analysis and Protection Methods of Corrosion Occurred in Dehydration Tower with RD

  4. PTA溶剂脱水塔先进控制与在线优化

    The Advanced Control and On-line Optimization System for PTA Solvent Dehydration Tower

  5. PTA装置溶剂脱水塔进料组分含量变化对塔分离效果的影响

    Influence of Feed Components on Distillation Operating in the Acetic Acid Dehydration System

  6. PTA装置溶剂脱水塔填料腐蚀的原因及影响

    Reason for packing corrosion of solvent dehydration tower and its effect on PTA production

  7. 该冷凝器将配备由PP(聚丙烯)制成的筛板水塔盘,用于循环母液的分配。

    The condenser will be supplied with perforated water trays from PP , for the distribution of the recycled mother liquor .

  8. 基于PCA-BP算法的PTA溶剂脱水塔软测量模型

    Soft-sensor model of PTA solvent dehydration tower based on PCA-BP algorithm

  9. 复杂环境下倒锥壳式45m水塔的爆破拆除

    Demolition of 45m high inverted cone water tower under complicated circumstances

  10. 定向爆破拆除500t级立柱式水塔

    Directional Blasting Demolition of a 500 t - class Water Tower

  11. 复杂环境下100t级钢筋砼水塔控制爆破拆除

    Controlled Blasting Demolition of A 100t-Level Reinforced Concrete Water Tower in Complicated Environment

  12. 文章采用曲线拟合的方法,并利用数学软件MATLAB对水塔流量进行计算,计算结果与实际记录基本吻合。

    This example given in this article adopts the method of curve fitting for calculation of water tower flow with mathematical software MATLAB . So the results are basically correspondent with the fact records .

  13. 36m高砖砌水塔定向折叠爆破拆除

    Demolition of a 36m-high Brick Water Tower by Directional Folding Blasting

  14. 文中介绍了运用定向控制爆破技术拆除24m高圆筒形水塔的爆破设计和安全防护措施。

    The blasting design and safety measures for directional demolishment of 24 meters high columnar water tower are presented in this paper .

  15. DJ-3新型塔盘在催化重整脱水塔中的应用

    Application of New DJ-3 Tray in Catalytic Reforming Dehydration Tower

  16. 51m高水塔的单向折叠爆破拆除

    Demolition of a water tower with a height of 51 meters by unidirectional fold blasting

  17. 然后,对该系统的测控终端子系统中的不同控制对象进行了较为深入的分析,并建立了流量、压力和水塔水位的PID控制模型。

    System . And then , this paper analyzes profoundly the different controlling objects in the Measurement and Control Terminate Sub. system , thereby establishing the PID ( Process ID ) control model of flux , pressure and water position in water tower .

  18. 新型DJ-3复合塔盘在重整原料脱水塔扩能改造中的应用

    Application of composite tray DJ-3 in capacity expansion revamping of reforming feedstock dehydrating tower

  19. 72m超长件脱水塔的运输

    Transportation of 72 meter long dewatering tower

  20. 9.14m凉水塔风机传动轴破坏原因分析

    Analysis on the failure reason of 9.14m blower fan driving shaft for cooling tower

  21. 本文介绍了复杂环境下的45m高钢筋混凝土水塔的控制爆破拆除,论述了水塔的爆破方案及爆破设计。

    This paper introduces the demolition of 45m high reinforced concrete water tower under complicated circumstances . The demolition of blasting and blasting design of the water tower are described .

  22. 其中,溶剂回收单元的脱水塔和共沸剂回收塔分别选用了NRTL-HOC和NRTL-RK模型对气液相非理想性进行校正。

    Due to the non-ideal gas-liquid behavior , NRTL-HOC and NRTL-RK model are used in solvent dehydration tower and entrainer recovery tower .

  23. 介绍在2辆400t液压全挂车上各安装一个200t桥式运输转盘,并采取了牢固的运输固定措施后,成功地将珠海PTA项目72m超长件脱水塔运输至吊装地点的工作方法。

    Zhuhai Project needs to transport 72 meter long dewatering tower to installation site This task is completed successfully by two 400t trailers which are equipped with one 200t slewing table each and safe secured facility .

  24. 云浮电厂125MW发电机组的闭式循环冷却水系统主要由冷却水塔、循环水泵和凝汽器等设备组成。

    The closed-cycle cooling water system of an 125 MW set in Yunfu Power Plant is made up by the cooling tower , water circulating pumps , condenser and other equipments .

  25. 通过合理选择切口参数、微差爆破时间、孔网参数、药量,成功地迫使41m高的水塔倒塌在长13m的范围内。

    By selecting the proper blasting cut parameters , delay internal , blasthole pattern parameters and charge weight , the water tower with a height of 41m was made smoothly to collapse in the area of 13m length .

  26. 对新型DJ-3复合塔盘的性能进行了简介,简述了重整蒸馏脱水过程及特点,重点突出蒸馏脱水塔的扩能改造,总结了DJ-3复合塔盘的工业应用及生产标定情况。

    This article introduces the performance of new DJ-3 tray and characteristic of distillation dehydration . Emphasizes the enlarge alteration of distillation dehydration tower . Summarizes the industrial application and demarcate analysis of DJ-3 tray .

  27. 第1个算例是24m高100m3水塔支筒截面设计,根据规范要求考虑了地震荷载。

    The first example is to design the section of the column of a water tower whose height is 24 m and whose volume is 100 m 3 . According to design standards , the seismic load is considered .

  28. 系统介绍了500t级立柱式水塔定向爆破拆除的关键技术问题,包括爆破切口高度及爆破参数的确定,爆破网路设计和爆破安全防护措施等。

    The mainly leading technology of the directional blasting demolition of the column-type water tower is systematically described , including how to ascertain the explosive notch height and the explosive parameters , how to design the explosive mesh and how to take the explosive safe measures .

  29. 本文简要介绍钢筋混凝土倒锥壳水塔标准图集(04S802)国标集修编和所考虑的问题。

    Briefly account of revision and problems taking into consideration of " national standard drawing far reinforced inverted - cone type water tower ( 04S802 ) " are introduced in this paper .

  30. 一个亮丽的新水塔已经建好了;在水泥搅拌机和泥瓦匠的喧嚣声中,Sathya与乡亲们即将入住的新居已经初具规模。

    Already , a bright new water tank has been set up . And , amid the crunch of cement mixers and shouts of masons , the new settlement , which will soon house Sathya and her people , is taking shape .