核岛

  • 网络nuclear island
核岛核岛
  1. 在我国,比较公认的是将核岛底板浇灌第一罐混凝土(FirstConcreteDate,简称FCD)之前的所有准备工作通称为核电前期工程建设。

    In China , all preparatory work prior to the First Concrete Date ( FCD ) for the base slab of the nuclear island is generally recognized as pre-construction preparation for a nuclear power plant .

  2. 简要叙述了中国核动力研究设计院进行的核岛专用检修设备的研制工作,描述了反应堆压力容器(RPV)螺栓孔与螺栓连接件的检修工艺流程。

    This paper briefly introduces the design and manufacture of nuclear island special servicing equipment of Nuclear Power Institute of China .

  3. 本文以SCI集团核岛主设备中国市场的营销策略为研究对象。

    This paper has SCI Group as the research object for NI main equipments marketing strategy in China .

  4. 通过各方面的分析,从市场定位、品牌策略、价格策略、服务策略等方面阐述SCI集团核岛主设备在中国市场上应该运用的营销策略。

    Finally describes the marketing strategy should be used by SCI Group in China from marketing positioning , brand strategy , price strategy and service strategy respectively .

  5. 采用SuperSap有限元分析软件包对核岛主泵主副推力轴承弹性支承的强度和刚度进行了数值分析计算,得出了一些有价值的结论。

    With the finite element analysis software-SUPER SAP , Strength and stiffness analysis are made for the elastic supports of bearings in main pump of nuclear power station and some worthy conclusions are got .

  6. 为实现对CPR1000核电机组核岛通风系统的可靠控制,采用了小型PLC作为其控制器。

    For achieving robust control of the nuclear island HVAC system of CPR1000 nuclear power unit , the miniature PLC is used .

  7. 核岛主要设备的安装是由法国Framatome公司承包的,安装工作进行很顺利。

    The installation of main facilities , contracted by French company Framatome is carried out successfully .

  8. 介绍了大亚湾核电站核岛冷水系统(DEG)的主要核心设备-制冷机组的功能原理及其维修情况;

    The function , principle and the maintenance situation of the main equipment ( chiller units ) of nuclear island chilled water system at Daya Bay nuclear power plant were presented .

  9. 余热排出泵是余热排出系统(RRA)的主要组成部分,是除核主泵之外唯一布置在核岛之内的核二级泵,是关系到核岛能否安全停堆的核心装备。

    The residual heat removal pump is a main component of RRA and is the only nuclear secondary pump which is installed inside the nuclear island except the main pump and which significantly affects whether the reactor can shut-down .

  10. 压水堆核岛机械设备的设计和建造规则(RCC-M)是核电厂设计和建造规则系列规范之一。

    The design and construction rules applicable to mechanical components of PWR Nuclear Islands ( RCC-M ) are a part of the collection of design and construction rules for nuclear power plants .

  11. GB/T16702-1996压水堆核电厂核岛机械设备设计规范核电厂总平面及运输设计规范

    Code for design of general plan and transportation of nuclear power plants

  12. 大亚湾核电站核岛的振动监测

    Vibration monitoring test for nuclear island of Daya Bay Nuclear Power Station

  13. 核岛结构物在爆破震动作用下的振动响应数据分析

    Analysis of Vibration Response Data of Nuclear Reactor Structure by Blasting Vibration

  14. 核岛大型设备和堆内构件的吊装

    The installation of large nuclear island facilities and reactor structure

  15. 秦山核电站核岛环廊爆破开挖技术探讨

    Investigation on the Blasting Excavation Technique of the Circle of Nuclear React Building

  16. 核发电站,原子能发电站岭澳核电站二期核岛安全壳预应力施工技术

    Construction Technology of Safety Shell Prestress in Ling'ao Nuclear Power Station Phase ⅱ

  17. 对于核岛安装,有4条关键路径;

    There are four critical paths for NI erection ;

  18. 岭澳核电站核岛稳压器安全阀的安装

    The Installation of Safety Valve of Nuclear Island Stabilizer in Ling'ao Nuclear Station

  19. 核岛厂房碱-集料反应的预防控制

    Preventive control of alkali-aggregate reaction in nuclear island building

  20. 核岛设计采购进度研究

    Research on Nuclear Island Engineering & Procurement Schedule Control The Conventional Island NUCLEON STRUCTURE

  21. 基于使用可用度的核岛外设备机会维修策略研究

    Study on Opportunity Maintenance Strategy of Equipment outside Nuclear Island Based on Operational Availability

  22. 核电站核岛施工塔吊布置

    Tower Crane Arrangement in Nuclear Power Station Construction

  23. 宁德核电站核岛基坑爆破开挖安全控制研究

    Study of safety control of foundation pit excavation by blasting in Ningde nuclear power plant

  24. 核岛厂房清水混凝土墙体无框模板设计与施工

    Design and construction of frameless form of as-cast-finish concrete walling of building of nuclear power station

  25. 秦山一期工程核岛大体积混凝土的温度测量东方锅炉岭澳核电设备国产化简介

    Temperature measurement of large volume concrete of nuclear island in the first stage of Qin Shan project

  26. 核岛主设备中的结构力学问题核岛大型设备和堆内构件的吊装

    Structural Mechanics in Primary Components of Nuclear Island The installation of large nuclear island facilities and reactor structure

  27. 介绍了在核电站核岛安装中焊缝无损检验时应用γ射线探伤的方法。内容包括γ射线探伤设备、γ射线放射源的选择;

    The method of r-ray radiographic examination for NDE of welds in Nuclear Island erection works is presented .

  28. 压水堆核电厂核岛主设备国产化关注点&大型锻件

    The main factor of localization of nuclear island major equipment of PWR nuclear power plant & Large forgings

  29. 主蒸汽安全阀是压水堆核电站核岛内主蒸汽系统的超压保护装置。

    Main steam safety valve is the protective device against overpressure in the steam system of nuclear island .

  30. 岭澳核电站核岛厂房屋面防水等级为Ⅰ级。

    Roof waterproofing standard of nuclear island plant of Ling'ao Nuclear Power Station was designed as grade ⅰ .