三峡地下电站
-
三峡地下电站送电华北及华中电网的效益分析
Analysis on Benefit of Power Transmission from Three - gorges Underground Power Station to North China and Central China Power Network
-
三峡地下电站尾水阻尼井具有施工环境小、安全隐患大、施工工期紧、过流面质量要求高等特点。
The tailwater damping well for the Three Gorges underground power plant is built in narrow space with high safety risk .
-
三峡地下电站进水口边坡稳定分析及加固优化
Analysis of slope stability and optimizing of anchor on the entrance slope of underground water power station in the Three Gorges Project
-
三峡地下电站施工控制网布设与维护市政局熟食中心装设空调设施工作小组
Layout and maintenance of construction control network of Three Gorges Underground Powerstation Working Party for the Provisioning of Air-conditioning to Urban Council Cooked Food Centre
-
三峡地下电站主厂房开挖变形特性分析百色水利枢纽地下厂房工程主变洞的开挖方法
A Deforming Characteristic Evaluation of Excavating Underground Hydropower Station on the Right Bank of the Three Gorges Project ; The Excavation Methods of Main-transformed Cavern of Underground Powerhouse of Baise Water Conservation Junction
-
三峡右岸地下电站设计与兴建时机的研究
Study on Design and Construction Opportunity of Right Bank Underground Power Station of TGP
-
三峡右岸地下电站变顶高尾水系统分析研究
Analysis on tailrace system with varying crown elevation of TGP 's right bank underground power station
-
三峡右岸地下电站排砂钢管焊接及内部缺陷分析
Welding and defect analysis of discharge sand steel pipe of Three Gorges Right Bank Underground Power Plant
-
三峡右岸地下电站进水口高边坡开挖爆破震动安全监测
Vibration safety monitoring of high side slope under explosive excavation in underground power station inlet of right bank of Three Gorges Project
-
介绍了三峡右岸地下电站设计过程、总体布置及兴建时机的研究。
The design process and the general layout of the rightbank underground power station of TGP and its construction opportunity are described .
-
三峡右岸地下电站引水隧洞开挖控制爆破技术研究
The study on controlled blasting in excavation of diversion tunnels of the underground power plant on the right bank of Three Gorges project
-
三峡右岸地下电站主厂房系统爆破开挖程序及开挖方法的研究成果,可供有关单位参考。
The results of the studies on the blasting excavation sequence and excavation options for the main carven system on the right bank of Three Gorges can be taken for reference by relevant units .
-
三峡工程右岸地下电站进水口施工期变形监测及特征
Distortion monitoring on intake of underground power station at the right bank in TGP
-
三峡右岸及地下电站监控系统总体方案设计
General design for monitoring system of TGP right bank power station and underground power station
-
三峡工程右岸地下电站主厂房施工期安全监测三峡右岸地下电站主厂房硐室开挖过程结构稳定性分析
Safety Monitoring for the Main Power House of Three Gorges Right Bank Underground Hydropower Station at Construction Stage
-
三峡水利枢纽右岸地下电站进水口预建段工程具有工程量大,洞群密,洞径大,工期紧,质量要求高的特点。
The pre-construction section of the Three Gorges underground electric power station located on the right side of the Three Gorges dam is featured with its huge construction quantities , dense tunnels and caverns with large diameters , tough timeframe and higher quality requirements .